Basic requirements: The base must be clean, smooth, no sand, no loose.
Construction: Generally it needs to brush for three times. Solidify 12-24h later for the first time,you can take the second brush, the direction of brushing should be vertical with the first time.For third time, if you need the rigid course, to enhance the adhesion stress,you can spread clean fine sand on the surface before the film completely solidify. And when the film with sand solidify completely, you can construct for protective layer.
Additional waterproofing layer: internal and external corners,tube root,crack etc. According to engineering demands, brush for once is also ok, protective layer construction can be taken after completely solidification.
Notes:
Before the film is not solidified mustn't get wet in the rain and forbidden to walking or other operations.
Stir evenly before normal use, it will not affect the quality.