Share on (1600626508499):







Working Process
1:Keg Waiting Position
2: Drain Residue--Mixed Water Wash--Drain--Caustic Wash
3: Waiting Position ( Caustic Soak)
4: Caustic Recycle--Caustic Wash Keg Spear--Caustic Recycle--Caustic Wash--Caustic Recycle
5: Hot Water Wash--Drain--Hot water Wash Keg Spear--Drain--Hot Water Wash--Mixed Water Recycle
6: Steam Sterilization--Pressure Hold
7: Waiting Position (Steam Continuous Sterilization)
8: Steam Blow the Outside of Keg Spear--Fill Co2(in order to exhaust steam )-- Co2 Pressurizing--Fill Beer--Hot Water Wash Filling Head and Outside of Keg Spear
9: Weight
Total Working Process:
Pasteurizing--Buffer Tank--Keg-in--External Keg washing--Drain Residue of the keg--Mixed water Wash--Drain--Caustic Soak--Caustic Recycle--Caustic Wash--Caustic Recycle--Hot Water Wash—Acid Wash—Acid Recycle--Hot Wash Recycle--Steam Sterilize--Co2 Pressurize--Filling--Weighting--Reject the Unqualified Keg According To The Weight--Revert The Keg--Keg-out
New products from manufacturers at wholesale prices