Multi Functional Fashionable Durable Backpack Tool Bag Zipper Tool Bag For Electricians

Share on (1600629976096):


Price:$15.00

Quantity:


Product Overview

Description





Product Category




Products Name:
Tool Bag
Size:
‎16 x 15 x 8.5 cm
Material :
 Polyester
Logo:
Accept customized Logo
Packaging:
Ploy bag or custom packaging
MOQ:
100pcs
Lead time :
1.Sample time :3-7days (Acceptable customs logo )
2. Large order time :
25-45 days delivery for mass production
Payment:
ISO,BUREAU VERITAS,RoHS,REACH




* 100% Polyester
* Imported
* Tool bag backpack for storing and transporting tools from one job site to the next; ideal for electricians and tradesmen
* Includes a black padded backpack made of durable polyester with a PVC-coated interior liner for added strength
* Orange interior for finding items more quickly
* 42 inside pockets and 9 outside pockets promote easy organizing and transport
* Large quick-access pocket on top for grabbing frequently used items
* 2 main zippered compartments: 1 for tools and parts and 1 for a cordless drill and battery
* Padded back support and shoulder straps with adjustable chest strap for a comfortable fit
* Product dimensions: 8.5 x 15 x 16 inches (LxWxH)






OEM/ODM






Company Profile




Why Choose Us




Sample Room




Production Process




Quality Assurance




Packge&Shipment




FAQ




Q1: Are you a factory or trading company?
We are a FACTORY located in Quanzhou City, Fujian province.

Q2: What products do you offer?
Our main products is backpacks, bags and some outdoor products.

Q3: Can I get a sample to check your quality?

Yes, we can provide you the sample to check the quality before bulk orders.

Q4: How long can I expect to get the sample?
The samples will be ready for delivery in 3-5 days after we receive the payment.

Q5: Can I have the products with my own logo?
Yes. We can offer both OEM and ODM service with prototype design and small MOQ.

Q6: Can you give me a discount?
Yes, based on wholesale service, we have better discount for bigger quantities. We will quote you the best price based on your order quantity.

Q7. What is the lead time for mass production?
About 30-50 days, depends on the order quantity.

Q8. How to do if I can’t reach your minimum order quantity?
Do not worry about that. We also can work low MOQ, but the cost will be higher.

Q9: How to make order?
We accept Alibaba Trade Assurance, T/T, PayPal for payments.




0.1814 s.