Share on (1600654065698):
Company Name | SHENZHEN NEWSKY TECHNOLOGY CO.,LTD |
Main products | Metal Stamping Die, Stamping mass production, Plastic Injection Mold, Prototype tool, Molding machining Parts, for Auto, Consumer Electronics, Appliance, Medical, Houseware… |
Material | SKD11, SKD11, DC53, asp23, S55C or As specified by the customer |
Mold accuratcy | +/-0.003mm |
Standard | DIN GB ISO JIS BA ANSI |
Mold lifetime | 1~3Million Shots |
Cavitation | Single cavity, multi-cavity |
Manufacture equipment | High speed CNC, EDM, Wire cutting, Grinding, Laser Marking, Drilling, Spotting machine, bending machine |
Molding facility | 3T~800T press machine; 50 to 230T Injection machines |
Stamping material | Stainless steel, Aluminum, brass metal sheet |
Surface treatment | Vabriator de-burr, Polishing, Anodizing, Coating, Laser mark |
Certificates | ISO 9001, IATF16949 |
Quality policy | Customer-centric, Meet all aspects of customer needs |
Hot sale products | ||||||||
Product advantage | ||||||||

Stamping die manufacturing process | ||||||||

Packing Details :
Tooling package: 1 tooling 1 wooden case;
Stamping package: Provide reliable packaging according to product features.
A: We are a factory which has been producing metal stamping parts for more than 16years.
A: We specialize in manufacturing metal stamping tool ,metal stamping parts.sheet metal parts,cnc machining part and welding structural parts etc.
A: Dacromet ,powder coating,Zinc plated, nickel plated, tin plated, brass plated, silver plated, gold plated, anodizing, salt fog test etc. Due to we are focus on stamping tools and metal stamping parts, surface treatment is done through suppliers.
A: Yes, sample order is available for quality check and market test, and it will be freight collect payment. If simple sample, we will not charge cost; If OEM/ODM samples, we will charge for the sample cost.
A:The MOQ is 1000pcs when have the inventory.
A:The stamping tool manufacturing cycle is 20-50Days, standard stamping parts is 3 to 10 days after payment. If OEM or make the tooling, we will confirm the delivery time with you.
A: we advise 30% T/T deposit, balance be paid before shipment.
A: YES. We have more than 16years OEM/ODM experience.

New products from manufacturers at wholesale prices