China prefabricated homes importer low cost pre fabric house folding modular prefabricated modern home

Share on (1600669459348):


Price:

Quantity:


Product Overview

Description





Yaoda Prefab house-K house —— Standard Material &Technical Parameter
Standard Material
Structure
Painted Steel structure
(Galvanized Steel Structure is optional)
Roof
50mm EPS sandwich panel
rock wool /glass wool sandwich panel are optional
Structure
Painted Steel structure
(Galvanized Steel Structure is optional)
Flooring
(for 1st, 2nd floor)
18mm Plywood , addition PVC carpet is available (Fiber cement board is optional)
Window
PVC sliding window, additon Anti thief window net is available
Aluminum sliding window is optional
Door
50mm Eps sandwich panel door
(Steel Door , PVC door are optional)
Ceiling
Excluded
(Gypsum ceiling, Pvc Ceiling are optional)
Electrical & water system
Excluded, but optional as request by client
Technical Parameter
Wind Load
28 m/s (80~ 100km/h)
can be design according to project requirements
Roof Live Load
30kg/m2 (area exceed 60m2)
50kg/m2 (area within 60m2)
Floor Live load
150 kg/m2
Eathquake resistance
7 degrees
K modular
1k=1.82m
P modular
1p=0.95m
Loading qty
300sqm~400sqm/40HQ
life span
5~10 years
Floors design
1~3 floors are available
Install speed
20~30m2 / day for skilled worker
10~15m2/ day for normal worker




Q1: Can we accept the custom service and personalized design?
A:Yes, our professional engineer team can make a drawing by following customers'requirement.

Q2: How to install?
A:We will provide detailed installation video and instruction to you. Technicians will be sent to help you on site if necessary. However, the visa fee, tickets, accommation, food and wages will be under taken by buyers.

Q3. Does your house material coordinate with my country climate ?
A: Our steel structure frame has high strength, high hardness, 100% corrosion resistance and 100% rust prevention. It can be used in the Gobi desert, mountain areas and seaside.

Q4: How can I connect to the local city power and the municipal drainage? 
A: The city power connects with the equipment room of the house. The water inlet and outlet will be connected by the precast pipes under the house. It is super easy connection. If the water outlet can not connect to the city drainage, then you can use septic tank instead. If you are still unclear about this point, you can contact us to explain your concerns and we will send you related drawings so that you can discuss with your local certified plumbers or mechanical engineers to seek solutions from them. 

Q5: If I order the house, will I get the house materials with different color than the rendering ?
A: The 3D rendering is our proposal for each standard model, therefore the actual color will be slightly different than what you saw in the rendering pictures. If you need to see the physical material color, we can arrange the materials samples to you with postage born by your side. You can place an Alibaba trade insurance sample order online, the sample cost will be refunded when you place the order.

Q6. How can you get a quotation for your projects?
A: You can chat with us anytime via Trade Manager to send your detail request or you can just fill out our questionnaire and send back to us.

Q7: What are your payment terms?
A:We are a member of Alibaba Trade Assurance which is a new service provided by Alibaba, safeguarding buyer's payment to suppliers to ensure suppliers fulfill their obligations regarding order delivery and product quality.
We accept both T/T payment and irrevocable L/C at sight. For the T/T payment, we accept 30% prepayment in advance and the balance
payable against copy of B/L.Support order, through alibaba platform

Q8: What is your delivery lead time?
A:Generally, we can deliver the goods to you within 15~25 days after receiving your 30% prepayment or original B/L.

More details will be discussed by your inquiry messages. 


0.1943 s.