CWGFG High Efficiency Pharmaceutical Grade granulation vertical continuous boiling fluid bed dryer drying equipment

Share on:


Price:$4,000.00
Price in USD:Details

Quantity:


Product Overview

Description



Products Description


The high efficiency fluid dryer is mainly used for drying power or granule from pharmaceutical, food and chemical industries and so on.




Working Principle of drying equipment
Put the material (granule or powder) into the charging hopper. Meanwhile filter the dust in the air by the filter and heat the material to the demanded temperature by the heater. When the air gets through the Dutch sieve, the material is fluid and dried. The steam is drawn by the fan through the dedust bags. The superfine powder will be collected by the filter bags and can be shaken back to the container after fluid by the upper shaking cylinder.




Application


Application of drying equipment
1. Pharmaceutical industry; Drink granules, capsule medicine granules;
2. Food industry: cocoa, coffee, milk powder, granular juice, condiments, etc.;
3. Other industries: pesticide, feed, fertilizer, pigment, dye, chemical industry, etc.;




Size information




We can also design and manufacture different varieties according to customers' requirements.


Machine Show








Our Service






Our Company


Xinxiang Chenwei Machinery Co., Ltd. is an innovative enterprise that integrating technology R&D, processing, manufacturing and trade services. Our company is mainly devoted ourselves to the design, fabrication and installation of screening, conveying, mixing, crushing and other related products.
We have 10 years of overseas after-sales experience, provide 24-hour online service, 365-day machine warranty, and have more than 50 patented technologies.









FAQ


Q1. Are you trading company or manufacturer?
A: We're manufacturer. We have our own factory and experienced technicians

Q2. What is your terms of payment?
A: T/T 50% as deposit, and 50% before delivery. We'll show you the photos of the products and packages before you pay the balance.

Q3. What is your terms of delivery and delivery time?
A: EXW, FOB, CFR, CIF, DDU, etc.Generally, it will take 7 to 20 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.




0.0145 s.