a) Are you a trade company or factory?Yeah, we are a factory that can provide with you various precision machining services.
Frankly speaking, many of our customers ran into questions such as 'How this part is made' or 'What kinds of machining processes are needed for my parts'. Qinbu has been involved with the CNC machining field and related industries for more than 13 years. We have rich experience in processing the parts with our high-advanced machine.
b) Can I customize my products?
Absolutely yes, and please help to share with us your detailed drawings. 3D and 2D drawings will help us understand your product well.
c) Will my drawings be safe?
Yes, we could sign the NDA before you send the drawings.
d) How long will I get the quotation?
The quotation will be sent to you within 48 hours after we understand the main details of your required product.
e) What will affect the price?
Frankly speaking, most of the cost will be the material and the structure of your parts. Then, a strict tolerance requirement and surface treatment will also increase your cost a lot. If you have questions about your parts, please feel free to contact us. We are happy to help you find the most cost-efficient way of machining your precision parts.
f) What is the MOQ?
No strict MOQ requirements. And it depends on the actual parts you need.
Sometimes there will be an extra tooling cost for the low volume production.
g) Can I get a sample for testing?
Yeah, the sample is available for you to take a test. We will supply you with qualified parts that meet your strict requirements after the sample confirmation.
h) How will you ensure product quality?
We will ensure the product quality through multiple inspection procedures:
1) Sample inspection before the serial production
2) Routing inspecting during the production
3) Visual inspection before shipping
i) How long will you produce the parts?
It will be based on the quantity amount and complexity and requirements of the job.
For the complex 4-axis and 5-axis machining parts, the delivery time is 25-45 days.
If it is very urgent for you, please let us know your expected delivery time, and we will try our best to arrange quick production for you.
j) How about transportation?
Samples and trial production by express (if not too heavy), otherwise by sea, or by air will be a good choice for you.
k) What are your payment terms?
TT, Western Union, Paypal, or others convenient for you.
The sample is 100% in advance;
Mass production is 50% in advance and 50% against the balance of payment before shipment. More details are to be negotiated.
l) What if the products we received are not good?
Please feel free to contact us, we will solve the problem together.