Share on:
Film fills are the most important filling media available for cooling tower. The usage of film fills in both counter flow and cross flow cooling towers allows relatively smaller sized towers to cool an equivalent amount of water compared to cooling towers using splash fills. This result in the saving of not only capital costs for a new tower but also reduces operational costs.
Width | Length |
610mm | 1200mm, 1220mm, 1830mm |
Usually PVC fill is produced into sheets, then we glue them into blocks or modules as follows:
--Evenly distribute water, prolong the residence time of water in cooling tower
--Increase the heat exchange area and heat dissipation.
--Vertical flute film fill has efficient thermal performance
--Resists erosion from water spray
--Made from fire retardant PVC material
Welcome to contact us for more details like price, delivery time, discount.
How do fills work in the cooling tower?
Cooling towers reject heat from water-cooled system to the atmosphere. Hot water from the system enters the cooling tower and is distributed over the fill (heat transfer surface). Air is induced or forced through the
fill, causing a small portion of the water to evaporate. This evaporation removes heat from the remaining water, which is collected in the cold water basin and returned to the system to absorb more heat. Each cooling tower line, although operating under the same basic principle of operation, is arranged a little differently
If you want to know more, welcome to send us an inquiry.
Packaging solutions: wooden pallet, wooden crate, nude packing in the container..etc.
Hebei Long Zhuo Trade Co.,Ltd, was established in 2013 and is located in Hebei Province, the north of China, for the past few years, we have devoted ourselves to provide top quality products to the global markets.
Our mainly product is about water treatment products, tube settler is one of our self invented and hot selling product.
Ethics to a business is what morality to a man. It is our eternal pursuit to stick to the principle of "integrity and quality first, strenuously developing highly advanced and sophisticated technology". we hope to achieve common development on the basis of trust and mutual benefit. With highly educated and experienced stuff and top quality products, we strive to create a bright future.
1.What is the MOQ of Cooling Tower Fills?
1000 PCs is the MOQ.
2.What is the lead time?
Usually it's around 10days, it depends on your ordering quantity.
3.Can we get some pieces as sample for our evaluation? How we can get?
Sure, we can send you samples, it's free, while you should bear the Express costs.
4.How can the goods reach us?
It depends on the ordering quantity and volume.
Small orders, you can choose to ship by sea, by air or by express.
Big orders with large weight and volume we recommend you to ship by sea.
If you want to know more, welcome to send us an inquiry.