New manufacture roof tile sheet metal sheet metal market Steel Coil/sheet/roll Direct secondary grade tinplate grade China price

Share on (1600729010973):


Price:$750.00 - $900.00

Quantity:


Product Overview

Description









Grade
Spte
Width
Customized
Thickness
0.14MM-0.50MM
Hardness
T1-DR9
Model Number
0.12-0.50mm*30-1080mm
Type
Tinplate Sheet
Application
Cans
Tolerance
±10%
Processing Service
Bending, Welding, Decoiling, Punching, Cutting
Product Name
Electrolytic Tinplate
Tin coating
2.8/2.8
Material
SPCC MR SPTE
Usage
Make Tin Package
Tolerance
±10%
Surface
Bright
Shape
Coil Cut












Product Advantages
1.Anticorrosive:13 years in heavy industrial areas,50 years in the ocean,104 years in the suburbs and 30 years in cities.
2.Cheap:The cost of hot-dip galvanizing is lower than that of other coatings.
3.Reliable:The zinc coating is metallurgically bonded to the steel and forms part of the steel surface,so the coating is more durable.
4.Strong toughness:The galvanized layer forms a special metallurgical structure that can withstand mechanical damage during transportation and use.
5.Comprehensive protection:Every part of the plated piece can be galvanized,and is fully protected even in depressions,sharp corners,and hidden places.
6.Save time and energy:Galvanizing process is faster than other coating methods.






















Global Market
We are committed to exploring the international market. Our customers come from all over the world, such as Africa, Latin America,
Middle East, Southeast Asia, Europe, etc. Our high quality and low price products have won their recognition.






FAQ


Q1: Are you factory or trading company?
A:We are manufacturer and trader. welcome you visit our factory.
Q2: Can you guarantee your productions quality?
A: Best quality is our principle all the time. We have 2 times QC one by one.
Our vision: to be world-class professional, reliable and outstanding steel supplier.
Q3: Do you provide samples? is it free or extra?
A: The sample could can provide for customer with free, but the freight will be covered by
customer account.
Q4: What is the payment of term?
A:By TT or LC or online payment.





0.2038 s.