Customized High Quality Anti Vibration Epdm Rubber Shock Absorber Strut Rubber Damping Block

Share on (1600763288282):


Price:

Quantity:


Product Overview

Description



Customized High Quality Anti Vibration Epdm Rubber Shock Absorber Strut Rubber Damping Block


Product Description


Product Name
Customized High Quality Anti Vibration Epdm Rubber Shock Absorber Strut Rubber Damping Block
Product Material
Rubber
Hardness
60~75 shore A
Mold Type
Mould pressing
Color
Black or customer's requirement
Drawing Format
.jpg/.pdf/.dxf/.dwg/.igs./.stp/x_t. etc
Packing
PE Bag, Carton, Wooden boxes, or as per the customer’s requirements
Payment Terms
T/T,Western Union,Paypal,Alibaba,etc
OEM & ODM
Available
MOQ
100pcs
Lead Time
As per the order quantity


Details Images






Product packaging


packing
1.small parts
plastic bags inner, then carton box outside.
2.large products
wooden pallets loading to container.
3.customized packing required.
shipping
according to your product's quantity, Usually 5 to 30 days after your payment.




Company Information






Customer Photos




FAQ


Q1: Are you a manufacturer or a trading company?
A1: We are the original manufacturer of custom rubber parts and custom plastic parts.

Q2: Where is your company located?
A2: Our company is located in hengshui City, Hebei Province, China.

Q3: Could I get free samples?
A3: We could provide small samples for free, but air freight or sea freight should be borne by customer side.

Q4: What should I provide in order to get an offer?
A4: Customers are required to provide material, inner diameter, outer diameter, cross section distance and quantity.

Q5: How is the goods packed by your factory?
A5: The goods are normally packed by plastic bags, carton boxes with pallets or wooden boxes.

Q6: What are the incoterms applied?
A6: The incoterms applied are FOB, CIF and CFR.

Q7: What are the payment terms accepted?
A7: We accept Alibaba Trade Assurance, T/T, L/C and West Union.

Q8: What about the delivery time?
A8: The goods are normally dellivered to customer side within 7-30 days based upon the mode of transport required.


0.193 s.