Share on (1600779939261):
plastic sheet extruder making machine for pp ps

Main Features
1. Introducing and intergrating advanced technology from home and abroad.
2. It applied for the plastic sheets like PP,PS,PE.
3. It can produce the products, such as beverage cup, frozen stick cup, jelly cup, etc.
4.Adopt 38CRMOALA high qality material with nitrogen treatment for the scrw ,barrrel ,module head and so on, so there parts can be used with wear and corrosive resisance .
5.With larger diameter for screw ,guarantee the main performance of sheet with good plasticizing.
6.For die head ,adopt advanced electric or hyduaulic exchanging device for filtering net, sothe operation seems to be simplified
7.This series extruder is composed of 6parts,extruder part ,filter part,die-head part,three rollers part,and traction part, rewinding part.
machine parameters
Model | RJD-670 | RJD-1000 | RJD-1400 |
Sheet Width(mm) | 670 | 1000 | 1400 |
Screw thickness(mm) | 0.3-2.0 | 0.3-2.0 | 0.3-2.0 |
Screw Diameter | 110 | 110 | 120 |
L/D ration of screw | 1:32 | 1:32 | 1:30 |
Main motor power(Kw) | 45 | 45 | 55 |
Max. Output(Kg/h) | 160 | 180 | 250 |
Assembling set power(Kw) | 80 | 85 | 100 |
Operating power(Kw) | 50 | 52 | 60 |
Exterior dimension(m) | 11.5*2.0*2.0 | 12*2.4*2.0 | 13*2.8*2.0 |
Assembling set weight(Ton) | 4.5 | 5.5 | 7 |
sample




Name:Ruian Junda Machinery Co., Ltd. (the original Ruian Junda Machinery Factory)
Location: located in Ruian City, Zhejiang Province South coast industrial zone district offices
Tangtou [Ryan Bridge (that is, Feiyun River Bridge) south]
The core concept:create the perfect service to the community
Company Spirit:follow the "use of technology, innovation is the soul, quality-oriented, excellence, service users, perfect, "
Service:the quality, with advanced equipment and technology, scientific management, production and customer satisfaction products.
factory

Customer
Company honor

1.samples will be first making drawing for customer checking and confirmation then starting mould production ,
machine quotation based on FOB Ningbo Port.
2.Installation and Start-up: 1 or 2 technicians will be assigned to coordinate installation, commissioning and training, cost for flight and suitable accommodation & food will be charged additionally. for cup machine noromally one week and cup line will be two weeks
Terms of Payment: 40% advance payment by T/T upon signing the contract.60% balance by the T/T before shipment.
Delivery time: 30 days after deposit reached.
Warranty: 12 months limited warranty. Starting from the date of machine arrival buyer's place excluding wear parts.
Thanks for viewing, If you have any questions please contact me
New products from manufacturers at wholesale prices