Sample Showroom Stone Organizer Holder Rack Slab Rock Stone Display Stand

Share on (1600787200951):


Price:$61.99 - $63.99

Quantity:


Product Overview

Description



Product Paramenters


Item Name
Tile sample display rack
Material
Iron
Color
Support customization
Craft of color
Powder coating
MOQ
50ps
Advantage
Disassemble design, save shipping cost. Multi-layer design, which can display multiple samples and save space. A variety of sizes
to meet the display needs of samples of different sizes.
Number of sample display
12 to 48 pieces


Display Stand Size
Corresponding Sample Tank Size
370*470mm
300*400mm
710*420mm
300*400mm
1050*420mm
300*400mm
1430*420mm
300*400mm
370*320mm
300*300mm
710*320mm
300*300mm
1050*320mm
300*300mm
270*320mm
300*200mm
510*320mm
300*200mm
750*320mm
300*200mm
670*320mm
300*600mm
1310*320mm
300*600mm
1010*320mm
300*300mm+300*600mm
370*470mm
450*300mm
810*470mm
450*350mm
520*470mm
450*450mm
1010*470mm
450*450mm
910*420mm
400*400mm
670*420mm
400*600mm
1310*420mm
400*600mm
870*420mm
400*800mm
1710*420mm
400*800mm
Please let me know the size you need, we will provide you with a detailed price.


Exhibition
















Product Production Process


Arrange the material (Q235 International carbon steel) >> Opening material (drilling, opening)>> Welding (Machine type ZS4116B,
qty 2pcs) >> Laser Cutting (Machine
type DPE-F1000WH3015M, qty 1pc) >> Bending(Machine type 63T/2500, qty 2pcs)
>> Punching (Machine type JB23/16t, qty 5pcs)>> Sanding >> Powder Coated >> Processing (private printing, sticker,string power) >>
Packaging




Packaging & Shipping




Company Profile






Main products of company




Customers visit the factory




Certificate




FAQ


Q1:Are you a manufacturer or a trading company?
A1:We are manufacturer. Our factory specializes in designing and manufacturing the display rack for more than 10 years.

Q2:Where is your factory address? Can I visit ?
A2:Our factory is located in Zhongshan City, Guangdong Province. You are always welcome to visit.

Q3:How many days does mass production take?
A3:The normal time for mass production is about 15 days, and the production time depends on the number of products ordered.

Q4:When can I receive the quotation?
A4:We rquotationeply within 24 hours of receiving the information.

Q5:How to get product samples?Do you need a fee?
A5: Normally it just takes 7 days, and there is sample fee.

Q6:What is the minimum order quantity? What about the payment method?
A6:Minimum order is 100pcs.30% paid TT in advance, and the rest paid before shipping.

Q7:Do you accept customed designs?
A7:Customed designs are accepted, details can be negotiated.

Q8:Are the shelf materials you produce differently?
A8:Yes, our products are made by metal,wood, acylic and the customed need.

Q9:How long is the cargo transportation time?
A9:Normal cargo transportation time is 20-30 days, remote countries and regions can negotiate.


0.1928 s.