Hot Selling Good Quality Long Survice Life Piston Micro Oil High Pressure Compressor

Share on (1600798935642):


Price:$56,000.00

Quantity:


Product Overview

Description





Product Description




1. Commercial proposal reference


Qty
Scope of supply
1
Air compressor:
20 m³/min 40 bar oil free PET compressed air installation
Power:200KW
Stationary oil free reciprocating air piston compressor mounted on a baseframe water cooled, complete with electrical motor,
after-cooler
1
40 bar air receiver : 500 L horizontal - hot galvanised,
Included with compressor
1
standard capacity PLC control and star/delta starter cabinet 380/50 Hz with microprocessor.
1
Sub Total for standard compressor package includes : technical documentation, mounting accessories, oil for 1st filling and water
cooling system
1
25AD closed cooling water systems for the compressor
1
Container packing
1
Transport costs FOB shanghai


2. Specification


Compress gas
Air
Model
HLW-20/40
Structure type
L model water cooling piston type,3 stage, 3 cylinder
Capacity:
20m3/min
Input pressure
Atmospheric pressure
Output pressure
4.0 Mpa
Input temperature
≤40 ℃
Output temperature
≤60 ℃(after cooling)
Oil temperature
≤60 ℃
Piston stroke
115 mm
Speed
470 r/min
Dia of 1st cylinder
1-515/35 , double action
Dia of 2nd
cylinder
1-350/35,single action
Dia of 3rd cylinder
1-230/35,single action
Motor power
≤200 KW
Cooling method
Water cooling
Lube method
Crankshaft,connect rod,,cylinder,pressure,packing micro oil lubrication
Motor
200kW、sf1.15、740r/min、380V、B3、IP23
Connect mothod
Direct resilient pin
Noise
≤85 dB(A)
Start method
Soft start
Mounting
No foundation
Size
4650/2200/2780mm
Weight
7800KGS




Zhangjiagang Yufeng Machinery Factory was found at 1998. It was renamed as Yufeng Beverage Machinery Co,.Ltd. in 2010. It is located at zhenbei road Leyu town Zhangjiagang city Jiangsu Province China.
We devoted to the development. For example we research and manufacture liquid food / water treatment / beverage packing / filling machine.
Our main products include " mineral water and purified water production line / carbonated beverage production line / 3 or 5 gallon production line etc. "
We sold our products to many cities with the strong technical force, advanced equipment, scientific management system and perfect after-sales service .












1.When can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60 days,the exactly depend on what kind of machine you ordered .

2.How long time for installation?
A: According to your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3.What kind payment be accepted by Yufeng?
A: We can accept L/C,Western Union,T/T.

4.How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pays air tickets go and back,accommodation,food,and so on.

5.Installation and maintenance:
A:The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Yufeng,or we can sent our engineers to help you.


4.4932 s.