Stainless Steel high temperature resistance Fuel Or Gas Cremation Machine Cremation Furnace For Human Corpse

Share on (1600804344370):


Price:$42,200.00 - $43,500.00

Quantity:


Product Overview

Description







Model Name
Body Cremation Machine Oven Cremator For Crematorium
Model Number
JLC4000-61
Material
Stainless and Refractory
Style
Eropean style
Type
Including burning systerm and cold systerm
Control Systerm
Japan Mitsubishi PLC and LCD touch screen or touch switches
Overall Dimensions
12000*2360*2700mm
Transport Creeper Trolley Size
3800*830*800mm
Temp of Primary Combustion Chamber
700-900 cent degree
Hearth Burning Pressure
-5 to -10Pa
Total Power
20kw
Ground Space
9-10m2
Average Fuel Consumption
3-7kg/case
Average Time
20~35min/case
Package Details
One unit of cremation machine load 1*40HQ container, around 27 Ton Totally
Payment
50%TT in advance,50%TT before shipping
Delivery
30days
















Work introduce
Our cremators adapt the latest combustion technology, four times burning technology ensure the emissions purified. 
First Time Combustion is direct combustion inside the primary chamber. Integrated with hot blast oxygen supply (300℃), most smoke and gas get burned as spontaneous combusting of corpse and enforced by the main burner supporting at times.    
Second Time Combustion: The smoke and gas substance released from the primary chamber gathered in the secondary burning and multiple collision take place, decomposition and oxidation of that harmful substances speedup this way and by the special construction of the secondary burning chamber.
Third Time Combustion is the strengthen combustion of the gas and smoke. Burner starts work to strengthen the burning if temperature under 700℃,otherwise above 700℃the high temperature gas and smoke burn itself matched with the suitable amount of oxygen.
Fourth Combustion occurred in the gas way and underground smoke channel, gas and gas substances flameless burned totally before injection into the atmosphere.














Q1: Do you provide on-site installation service?
Yes, we will provide on-site installation, debugging, training and other services.
Q2: Why did I choose your product?
We have advanced technology, can provide cheaper prices, better product quality, higher performance, lower maintenance costs and perfect after-sales service.
Q3: How long does it usually take for your products to ship?
Generally, the delivery time is two to three weeks.
Q4: Do you support OEM service?
Yes, we fully support OEM services and welcome you to customize our products.
Q5: What if the product received has been damaged?
Please rest assured that within 15 days after receipt of the goods, we will provide no reason to return or exchange services.
Q6: Can I get a cheaper price?
Of course, please contact us, we can give you a cheaper price.
Q7: What if the product breaks down in the future?
Don't worry, we offer a very long warranty, and we will send our engineers to repair it, or even we can replace it.






0.0165 s.