High Quality Stainless Steel Food Trolley Beverage Bakery Cooling Tray Rack Bread Trolley For Fast Food Kitchen Equipment

Share on (1600836734299):


Price:$45.15 - $53.30

Quantity:


Product Overview

Description









Product Name
Gastronorm Racking Trolley with 6 Tiers
Material
SS201 Kitchen Trolley
Size
380x550x950 mm  
Color
S/S
Customize
Available
Logo
JIWIINS and OEM
Package
1 PCS / CTN
Features
Gastronome Trolleys Ideal for A Wide Range of Food Transport,Serving and Storage Tasks within the Catering Industry
100% Avoid Rails-Dropping by Strong Spot Welding
Fitted with GN Pan Size 1/1,1/2,1/3 and 2/1 for 6 Tiers to 20Tiers
Single Or Double Row Designs Will Meet Your Different Demands
Stable Layers Option for Supportion Heavy Duty Service,Max Loading 15KG/Shelf
Tray Locks on Either Side for Anti-Sliding the Pans
Smooth Edge of Each Bars Caring Your Hand
Fitted with 4PCS TPR/PVC Swivel Castors,2 with Brakes.


















FAQ
1.Q: How long for the mass production ?
A: Normally 40 days after receive 30% deposit, but it should depends on order
quantity and inventory,the final lead time need to be negotiated according to your order

2.Q:What kind of trade terms do you accept?
A: We only accept FOB GUANGZHOU or EXW.
   (1) FOB GUANGZHOU for order value more than US$10,000.00
   (2) EXW for order value less than US$10000.00

3.Q: What's the payment term?
A: TT 30% before production, 70% balance payment before delivery.

4.Q:What's the MOQ?
A: It's available to mix different items, order amount US$4000.00

5.Q:What's the cost and lead time if I need samples?
A:Normally, it's our pleasure to provide free sample, just charge freight.
Sample lead time: 2-5 days for stock items.

6.Q:Can I customize products or do OEM?
A:Yes, we welcome OEM and accept customized orders, but the quantity must meet our MOQ. 

7.Q: Is the quality of your products guaranteed?
A: JIWINS is committed to providing quality products to all our customers.
    (1) We have got relevant certificates such as NSF and SGS;  
    (2) Our quality inspection team will carefully follow up on the whole completed production orders.



0.2059 s.