Share on (1600894894769):
![]() | Double Wings Drop Test Machine |
In the process of moving or transporting the product, there may be a |
0
This series of drop test machine, using double column to the spring buffer, height scale instructions, stable and reliable, can be achieved edge, surface, angle drop.
Model | GT-LC05-2 |
Display mode | Digital display |
Drop height | 400~1500mm( Will stop automatically at the setting height) |
Dimension of drop panel | (W*L*T)1200*1400*14mm |
Max weight of sample | 65kg |
Max dimension of sample | (L*W*H)800*800*800mm |
Transfer method | Electric drive |
Single-wing area | (W*L)350*700mm |
Power | AC380V,50/60Hz |
Weight of machine | About 400kg |
Dimension | (L*W*H)1400*1200*2090mm |
Application range | Suit case, carton, packing products and so on. |
ISO 2248,JIS Z0202,GB/T4857.5, ISTA
0
(A) The test steps
1) Turn on the power switch, Power light is on(At this time is strictly prohibited non-professionals into the yellow cordon to do any relevant test operation. It’s very dangerous). Check whether the two wings in the horizontal position, if it’s not, need to adjust to the horizontal position by hands;
2) Place the test specimen on the wings with a fixture; Everyone needs to stand outside the security line.
3) Press the up button to raise the two wings to the desired test height, then press the stop button to stop rising;
4) Press the down button, let the specimen fall freely, when the test is finished, record condition of the specimen.
5) Repeat step 2~4 for other specimens. The face, angle, edge are tested accordingly.
6) Remark: Nobody is allowed on the working bench when test is going.
(B) Precautions and maintenance
7) The enclosure must be grounded, otherwise there is a risk of electric shock
8) Power line should be connected with the air switch and the contactor which has same capacity and electric leakage protection
9) When the machine is power on, only Control panel is allowed to touch, to prevent abrasions or injuries
10) If the machine needs to move, please be sure the power is cut off, cooling it for 5 minutes before operate.
11) After a new machine is installed in factory, please add some low concentration machine oil on slide bar, other corrosive oil like rust preventive oil and high concentration oil are forbidden.
12) If dust becomes too much on the location that needs oil, please down the machine on a low place, clear up the oil added before,and add new machine oil. Please add lubricating oil on the transmission parts regularly.
13) Drop testing machine belongs to impact mechanical equipment, when a new one is used for more than 500 times,the screws should be tightened in case it malfunction suddenly.









New products from manufacturers at wholesale prices