---Please Attention--- |
   |
---Why Choose Us--- |
 |
---Product Display--- |
 |
 |
---Product Structure--- |
 |
---Accessory Included--- |
 |
---Accessory Optional--- |
 |
---Production Description--- |
Item Name |
20ft 40ft Flat Pack Container House Stackable Foldable Prefab Modular Living Homes |
20ft Normal |
6055mm (L)*2350mm (W)*2480mm (H)*2896mm(H)
|
20ft Foldable
|
5845mm (L)*2510mm (W)*2530mm (H)*2780mm(H) |
Main Material |
Galvanized Steel Structure with Sandwich Panel Wall and Doors, Windows,etc. |
Weight |
1500kgs |
Service Life |
30 years |
Steel structure |
Square Tube and Bending Steel Plate |
Columns |
2.0mm 2.3mm 2.5mm 3.0mm Hot Galvanized Steel Structure with 4 corners casts 210*150mm |
Wall |
50mm/75mm/100mm EPS/Rock Wool Fireproof Sandwich Panel |
Roof |
50mm /75mm Glass Wool Fireproof Sandwich Panel |
Door |
Steel Security Door W970*H1980mm, furnish with a handle lock with 3 keys or Sliding glass door W1500*2000mm |
Window |
Double Glazed PVC/Aluminum Window with Window Screenand Guard Net Made of PVC/aluminum frame W1130*H1130mm, glazed with double glass in a thickness of 5/8/5mm. |
Floor |
MGO Board/Optional Floor
|
Connection kits |
PVC Connection Kits for ceiling, floor and walls. |
Electricity |
3C/CE/CL/SAA Standard with Distribution Box, Lights, Switch, Sockets,etc. |
Roof Frame |
2.0mm 2.3mm 2.5mm 3.0mm Profile Steel |
Floor Frame |
2.0mm 2.3mm 2.5mm 3.0mm Profile Steel |
Corner Post |
2.0mm 2.3mm 2.5mm 3.0mm Profile Steel |
Option Accessories |
Furniture, Sanitary ware, Kitchen, A/C electrical appliance for accomodation, office, Dormitory |
|
Toliet, Bathroom, Shower, Steel roof, Cadding panels, Decorative material , etc. |
Advantage |
(1) Fast installation: 2 hours/set, saving labor cost (2) Anti-rust: all material use hot galvanized steel (3) Waterproof: without wood ceiling (4) Fireproof: fire rating A grade (5) Simple foundation: just need 12pcs concrete block foundation (6) Wind-resistant (11 level) and anti-seismic (9 grade) |
---Quality Control--- |
 |
---Advantage & Installation--- |
 |
 |
---More Styles--- |
 |
---Product Process--- |
 |
---Product Application--- |
 |
 |
---Company Information--- |
Tangshan Baoding Building Materials Industrial Park, aming to become an integrator of the global supply chain, consists of nine branches including Tangshan Baoding Building Materials Co., Ltd., Tangshan Kunhong Steel Structure Co.,Ltd., Zhongtang Shengding Electrical Equipment Co.,Ltd., Zhongzhi Baiheng Construction Engineering Group Co., Ltd. and Tangshan WaiYang Supply Chain Management Co., Ltd, etc. Tangshan Baoding Building Materials Industrial Park across building materials supply, international trade, housing construction, municipal construction, highways, electricity, heat, natural gas, landscaping and many other fields. Now it has been developed into a diversified and modern enterprise. Wish we could create brilliant future together with you.
In 2008, Tangshan Baoding was established and built XPS insulation board production line. In 2009, Built the cement mortar and external wall insulation system production lines. In 2014, In 2014, Zhongzhi Baiheng Engineering Construction Co., Ltd. was established. In 2016, Established Haoding Construction Machinery Equipment Leasing Co., Ltd. and Ruiding Logistics Co., Ltd. Entering the machinery leasing and logistics industry. In 2017, Zhiding Real Estate Development Group Co., Ltd. was established, entering the fields of municipal, heat and gas, and many other fields with an output value of 1 billion yuan. In 2019, became the leader of the construction industry in Tangshan City with an annual output value of 2 billion yuan. In 2022, starting the construction of Baoding Group Industrial Park and established Kunhong Steel Structure Co., Ltd. In 2023, Baoding Building Materials Industrial Park is officially put into use. In 2023, Estabilshed Tangshan Waiyang Supply Chain Management Co.,Ltd. Entering Internal trade business.
|
---Our Certificate--- |
 |
---Our Team & Exhibition--- |
 |
---Packing & Shipping--- |

|
Packing |
20ft can load 3-6 units, 40ft can load 6-12 units, Customized Size Available |
Shipping |
7-15 days after received deposit payment, for normal size,we have 200-300 units in stock |
---FAQ--- |
1. Free sample |
Free sample is available |
2. MOQ |
1 Set
|
3. Delivery time |
7-15 days after received deposit payment |
4. Loading port |
Tianjin port in China |
5. Payment terms |
TT or LC at sight |
6. Mill information |
Tangshan Baoding Construction Materials Co.,Ltd
|
7. Annual output |
100,000 sets per year |
8. Advangages |
Good quality control, lower transportation cost, experienced workers, competitive price |
9. Market |
Southeast Asia, middle east, Europe, North America |
---Contact--- |
 |
---Other Product You May Like--- |
   |