Water dispenser hot tank with band heater Heating Tank

Share on (1600906197829):


Price:$8.00 - $10.00

Quantity:


Product Overview

Description



Recommend Products




Detailed Images




Certifications




Company Profile




Workshop




ISPURING PRODUCTION CAPACITY
Water dispenser : 6 production lines; daily production capacity 600 units;
Water purifier: 5 production lines; daily production capacity 300 units;




We are a professional water dispenser manufacturer, specializing in OEM orders.
With a variety of product styles, we warmly welcome your inquiry and are at your service 7*24 hours!


Packing & Delivery


-Brown carton box-
-White carton box-
-Color carton box-


ISPURING SERVICE: Free for Carton box and Logo design




-Bottom foam- -Plastic film bag- -Upper foam- -Cross packing belt-


-Sample-
Standrad export box and strong wooden box, protect sample from damage during transportation.
-Bulk order-
Shipped by FCL, protect product from damage caused by repeated loading and uploading during transportation.
-LCL goods-
Packed in pallet with film, protect product from damage caused by repeated loading and uploading during transportation


FAQ


Q: What is the difference between Electronic cooling system and Compressor cooling system?
A: The compressor type is cooled by refrigerant R134a, Cooling Power/Capacity : 90-95W, 2L/H, (5-10°C)
The electronic type is cooled by electronic semiconductor, Cooling Power/Capacity : 75W, 0.75L/H, (10-15°C)
So, compressor cooling type is faster, colder and more stable than electronic cooling type.

Q: What is the production time?
A: 25-30 days after deposit received.

Q: Can I put my own Logo on machine?
A: Yes, we are specializing in OEM order. Logo, carton design, color are all can be customizable.

Q: What is MOQ?
A: 120pcs for compressor cooling system, 280pcs for electronic cooling system.

Q: What is the guarantee term for product?
A: Compressor 3 years, Plastic parts 1 year and offer 1% of total order quantity spare parts for FREE CHARGE!

Q: What is the payment term?
A: 30-40% deposit and balance should be paid before container load




0.1936 s.