Auto tension controller magnetic powder brake clutch controller digital manual tension controller parts magnetic powder clutch

Share on (1600907283300):


Price:$200.00 - $220.00

Quantity:


Product Overview

Description





Products Description





Tension controller

Tension controller changes the voltage from AC220V to DC24V

Feeding
: The electric motor outputs the torque, connects the electromagnetic powder brake. The electromagnetic powder brake connects the feeding shaft and collects the materials. The controller adjusts the rotation speed of the electric motor and the tension controller adjusts the tension of the electromagnetic powder brake, resulting in uniform material feed and proper speed.
Collecting: The electric motor outputs the torque, connects the electromagnetic powder brake. The electromagnetic powder brake connects the collecting shaft and collects the materials. The controller adjusts the rotation speed of the electric motor and the tension controller adjusts the tension of the electromagnetic powder brake, resulting in uniform material feed and collecting tube tightly coiled.




Measurement accuracy
﹤±1 Newton
Sampling speed
100 millisecond
Main output mode
DC 0-2A Constant current output(asapted load impedance 8-12Ω
Auxiliary output
DC 0-5V (MAX 10MA)Analog signal output
Dimensions
W245×H155×D140(mm)
Installation size
W230×H150×D120(mm)
Power
AC 180-245V 50/60Hz






main products






usage industry




Company Profile






our Certificate




our Exhibition






FAQ


Q 1.When can I get the quotation?
We usually quoted within 12 hours after receiving your inquiryment.If you are urgented,please whatsappus or email us,we will reply your inquiryment immediately.
Q 2.How should I place an order?
Please send us shaft roller drawings or more requirement,we will write back unit price base on all of your requirements.
Q 3.What's your MOQ basis?
MOQ depend on customized rollers drawings.normally MOQ≥1.
Q 4.What about the delivery time for production?
Depend on rollers drawings and quantity.normally 7-15 working days after receive deposit.
Q 5.What is the term of shipment?
EXW/FOB/CIF/CFR etc.always follow customer requirement.


0.1913 s.