Hydrogenation Desulfurizer Sulfur Removal Nickel Molybdenum Hydrodesulfurization Catalyst

Share on (1600909162525):


Price:$50.00

Quantity:


Product Overview

Description





Products Description




Brief Introduction
SDDZ-NIMO Nickel-Molybdenum Hydrodesulfurization Catalyst is used for hydro conversion of organic sulfur in the coken oven gas, refinery gas and natural gas. Meanwhile, the olefins contained in the gas are hydrogenated to protect the normal use of various catalysts in the post-stage.
The reaction is summarized as below:
COS+H2=CO+H2S
CS2+4H2=CH4+2H2S
C2H5SH+H2=C2H6+H2S CH3SCH3+2H2=2CH4+H2S
C4H4S+4H2=C4H10+H2S CnH2n+H2=CnH2n+2





Product Advantages
1.High activity at low temperature.

2. Higher strength,uneasy to powdering, reach the requirement at low pressure and temperature.

3.Large surface area, high conversion, and the conversion of organic sulfur such as thiophene exceeds 98%.

4.Large specific surface area, uniform distribution of active components, good stability and high conversion rate.



Specification


Typical physical and chemical property


Name
Nickel-Molybdenum Hydrodesulfurization Catalyst
Model
SDDZ-NIMO
Brand
DZC
Appearance
Gray-blue sphere
Size
Ф3~5mm
Radial Crush Strength
≥50.0 N/cm
Bulk Density
0.6~0.8kg/L
Main Components
NiO
2~3%
MoO3
7~9%
A12O3
≥78%
Operation Temperature
200℃~450℃
Operation Pressure
Normal~6.0MPa
Space Velocity of the Feed Gas
500 ~ 3000h-1(g)
Conversion Rate
≥99 %


Package & Transport




Company Profile




Shandong Dengzhuo Chemical Co., Ltd, with an area of 66,000 square meters, is specialized in the study and production of catalysts and molecular sieves, like Methanol Synthesis Catalyst, Ammonia Synthesis Catalyst and Steam Reforming Catalyst, FCC catalyst, FCC additives, and aluminum sol,etc. Our factory has an area of 3000 square meters of R&D Center, including technology development, FCC catalyst performance evaluation, analytic laboratory, and crude oil analysis laboratory.




FAQ


Q1: What is your MOQ?
Typically, MOQ is 1 kilogram, which varies with different products.

Q2: How much is the shipping cost?
Shipping costs vary depending on your specific address and shipping method, please consult us for details.

Q3: What is the average lead time?
For samples, the lead time would be about 5 working days. For mass production, the lead time would be 15-30 working days after receiving the deposit payment. The lead times become effective when we have received your deposit.

Q4: What trade terms and payment methods do you support?
Typically, we collect payments through TT, wire transfer, Western Union, etc. However, the specific cooperation methods can be negotiated amicably by both parties.

Q5: How can you guarantee quality?
Usually, there are pre-test materials before mass production; There will be a final inspection before shipment.


0.2099 s.