The various stages of the cement production process include crushing, pre-homogenization of raw materials, homogenization of raw materials, preheating and decomposition, firing, cement grinding and packaging.

Cement equipment mainly includes cement rotary kiln, cyclone preheater and grate cooler. As the main equipment for calcining cement clinker, cement rotary kiln is widely used in cement, metallurgy and chemical industry. It consists of cylinder, supporting device, supporting device with baffle wheel, transmission device, movable kiln head, kiln tail sealing device and combustion device, etc. It is characterized by simple structure, reliable operation and easy control of production process. Grate cooler is a kind of quenching type cooler, by blowing cold air to quench the clinker laying in layers on the grate plate to achieve the purpose of lowering the temperature.




The various stages of the cement production process include crushing, pre-homogenization of raw materials, homogenization of raw materials, preheating and decomposition, firing, cement grinding and packaging.

Cement production line is a line of equipment composed of a series of equipment to produce cement. It mainly includes the processes of crushing and pre-homogenization, homogenization of raw material preparation, preheat decomposition, firing of cement clinker and cement grinding and packaging.





In the cement production line, at least 3 tons of materials (including all kinds of raw materials, fuel, clinker, mix, gypsum) are ground for every 1 ton of silicate cement produced. Statistics show that dry process cement production line grinding operations need to consume power accounts for about 60% of the power of the whole plant, of which raw material grinding accounted for more than 30%, coal grinding accounted for about 3%, cement grinding accounted for about 40%. Therefore, a reasonable choice of grinding equipment and process flow, optimize process parameters, correct operation and control of the operating system to ensure product quality, reduce energy consumption is of great significance.

Among the cement production methods, the silicate type cement process is representative. It is mainly based on limestone and clay as the main raw materials, after crushing, batching, grinding made of raw materials, and then into the cement kiln calcined mature materials, and finally add an appropriate amount of gypsum (sometimes also mixed with mixed materials or additives) and grinding and become.



Working Flow




Cement production equipment can be categorized into dry cement production line (including semi-dry method) and wet cement production line (including semi-wet method) according to the different methods of raw material preparation.
The advantage of dry production is low heat consumption (e.g., the heat consumption of clinker in dry kiln with preheater is 3,140-3,768 J/kg), but the disadvantage is that the composition of raw material is not easy to be uniform, the workshop dust is more, and the electricity consumption is higher.

Wet production has the advantages of simple operation, easy control of raw material composition, good product quality, convenient slurry transportation and less dust in the workshop, etc., but the heat consumption is higher (the heat consumption of clinker is usually 5234 ~ 6490 J / kg).



Dry Process
Wet Process
1. Mixing of raw material in dry state in blenders.
1. Mixing of Raw materials in wash mill with 35 to 50% water.
2. The dry materials exiting the mill are called “kiln feed”.
2. Materials exiting the mill are called “slurry” and have flowability characteristics.
3. Fuel consumption is low i.e., 100 kg of coal per tonne of cement produced
3. Fuel consumption is high i.e., 350 kg of coal per tonne of cement produced
4. Cost of production is less.
4. Cost of production is high
5. Capital cost is high due to blenders.
5. Capital cost (Cost of establishment) is comparatively less
6. Size of the kiln needed for manufacturing of cement is smaller.
6. Size of the kiln needed for manufacturing of cement is bigger.
7. Difficult to control mixing of Raw materials, so it is difficult to obtain a better homogeneous material.
7. Raw material can be mixed easily, so a better homogeneous material can be obtained


Our Advantages


Since the establishment of the company in 1995, it has developed into a large-scale enterprise integrating scientific research, production and sales. Our factory can produce cement production line equipment with various outputs, ensuring quality, timely delivery, and timely and efficient after-sales service.




Our senior technical engineers can provide solutions to the problems you encounter through online or quickly arrive at your production site at any time, and our experienced installation team can quickly and efficiently build and install your cement line factory, allowing you Produce cement products that meet the requirements in the shortest time, allowing you to see benefits in the shortest time.


No.
Workshop name
Main equipment
Work plan
Quantity
1
Limestone crushing
Single-Stage Hammer Crusher
Feeding size: <600mm
Capacity: 120t/h
Discharging size: 90% <25mm
6d/w×7h/d
1
2
Mixed material crushing
High-Efficiency Crusher
Feeding size: <215mm
Capacity: 50t/h
Discharging size: 90% <20mm
1d/w×7h/d
2
3
Raw material grinding
Ball Mill
Feeding size:≤25mm
Finished fineness:Feeding moisture:≤ 8%
Finished moisture:<1%
Capacity: 50 t/h
7d/w×20h/d
1
4
Clinker calcination
Rotary Kiln
Heat consumption: ≤950kCal/kg
Capacity: 800t/d(33.3t/h)
Power: 220kW
Fuel: gas
7d/w×24h/d
1
5
Cement grinding
Cement Mill
Feeding size:≤20mm
Finished fineness:Capacity: 45 t/h PC32.5
Power: 1600kw
7d/w×22h/d
1
6
Cement packing
Rotary Packing Machine
Capacity: 100t/h
With cement bulk machine
6d/w×12h/d
1


Packing & Delivery




Customer Cases





500TPD Cement Production Line in Philippines

1000TPD Cement Production Line in Peru





2000TPD Cement Production Line in Oman

800TPD Cement Production Line in Uzbekistan


Company Profile




ZOOMJO is a large-scale enterprise that mainly produces heavy mining machinery and integrates scientific research, production and sales. It mainly produces various large and medium-sized crushing equipment, sand making equipment, drying and calcining equipment, mineral processing equipment and other series of products.

ZOOMJO has developed steadily from its establishment to the present with its technical strength, and has grown stronger day by day, and has gathered a large number of high-level management and scientific research personnel. Our company covers an area of 50,000 square meters, and another 10,000 square meters of modern office space, R&D center and sales center. The company has more than 500 employees, including more than 20 intermediate technicians. With strong technical strength, scientific management system and high product quality, ZOOMJO will rapidly grow into an important production and export base of mining machinery.


FAQ




1. How is the quality of your products?

Our products are manufactured strictly according to national and international standard, and we take a test on every grinder before delivery.

2. Is the price of products reliable?

Yes, we are manufacturer and we have the strength to give you the lowest price compared with other dealers. However, we have the policy that "According to the quantity order, we will offer the lowest price as possible with our utterly honest attitude towards business ".

3. Will you help with installation and staff training?

Yes, we can send our engineers to your place to guide the installation and train your workers if needed, but the buyer should bear our technician’s round tickets, accommodation, and food.

4. Service and Payment Terms?

a. We usually accept T/T, L/C, but other terms also workable.
b. We take pictures of finished products before delivery.


0.1614 s.