Electric Type Hydraulic Stone Splitter For Norway Market Darda Concrete Splitter

Share on (1600919458248):


Price:$995.00

Quantity:


Product Overview

Description



Product Overview


Hydraulic Rock Splitter

Hydraulic splitter main role: quarry barren material mining.

1) large ores (metal ores, non-metallic ores) of the secondary Disintegration;
2)concrete components (concrete pavement, machine tool foundations, bridges and housing components) local and total demolition operations.
3)Demolition of concrete structures in indoor or confined spaces;
4)Excavation of tunnels, ditches and other rocks, etc.











* Hydraulic Power Station Engine:
Diesel/Gasoline/Electric/Pneumatic

*500-820 Ton splittering force
fast crack time:5-12s

* one station drive up 1~ 10 splitter gun



PRODUCT SPECIFICATIONS




Engine Model
Diesel 
type
Gasoline type
Electric type
(220v 380v)
Pneumatic type
Dimensions
(MM)
1150*1180*940
1200*1170*800
384*280*620
364*280*620
Weight
(KG)
120
100
75
100
Fuel tank
capacity
(L)
40
40
30
40
Working
medium
/
46 or 68 anti-wear
hydraulic oil
46 or 68 anti-wear
hydraulic oil
46 or 68 anti-wear
hydraulic oil
46 or 68 anti-wear
hydraulic oil
Engine
power
(KW/HP)
7.7KW
7.5HP
0.75KW
2.2KW
4KW
7.5KW
4.04kw
5.5HP
Working
pressure
(Mpa)
55~60
55~60
55~60
55~60
Work
flow
(L/Min)
2. 13
2. 13
2. 13
13
Configurable
splitting machine
number
(Handle)
1~ 10
1~ 10
1
2~3
4~6
7~ 10
1~ 10




model
DS80A
DS80B
DS80C
DS80D
DS90A
DS90B
DS90D
DS90E
weight
(kg)
20
21
25
27
26
26.5
27
28
diameter
(mm )
Φ38~42
Φ40~42
Φ40~42
Φ45~48
Φ38~42
Φ40~42
Φ40~42
Φ45~48
Piston
inside
diameter
(mm)
80
80
80
80
90
90
90
90
The
minimum
hole depth
(mm )
≥450
≥500
≥600
≥800
≥450
≥500
≥600
≥700
Wedge length
(mm )
150
200
300
450
150
200
300
350
Actual division
force
(T)
280
300
420
450
420
450
480
500
Crack time
(S)
5~ 12
5~ 12
5~ 12
5~ 12
5~ 12
5~ 12
5~ 12
5~ 12
Splitting
force
(T)
500
600
680
720
680
720
780
820


Details Images




Product packaging




Related Products




Click to buy related product


Drill rod
Drill bit


Recommend Products


Other Pneumactic Hand Drill
Pneumatic Air Leg Drill


BR45 Hydraulic Breaker
Driven by hydraulic power unit
BR67 Hydraulic Breaker
Driven by hydraulic power unit


Company Profile




FAQ


Q1
where is Deckwell factory located?
A1:Deckwell factory is located at Fuzhou cityFujian Province.Our factory is build in 2003 and we start to do export from 2008.

Q2
What is our main application?
A2: 1.Hydraulic power unit and tools 60%
2.Pneumatic tools 40%

Q3
What is the payments term ?
A3:
1.T/T
(1)Payment<=5000USD100% in advance.
(2)Payment>=5000USD,30% T/Tin advance balance befor shippment. 2. L/C at sight.
3.Western Union

Q4
What is the delivery time?
A4:Generally 5-15 days.It will need 30 days if the order is big amount as USD100 000.

Q5
Can I Mark My Own brand on the machine?
A5: Yes, But you have to provide your authority of brand to us

Q6
Can I get a sample?
A6: Yes, But the sample and the express freight cost must be paid by customer.


0.0172 s.