poultry industrial exhaust fan ventilation/hot sale cooling ventilation fan

Share on (1600925038151):


Price:$130.00 - $150.00

Quantity:


Product Overview

Description


poultry industrial exhaust fan ventilation/hot sale cooling ventilation fan 


photobank (5)


exhaust fan specifiction


 


 


Material of components:


 


1, Frame:  frames are made of hot dip galvanized sheetframe thickness 1.0mm,. Galvanizing layer 180g/square meters.


2, Blade:  6 pieces, material 430/304 stainless steel.


3, Impeller: casting aluminum alloy impeller.


4, bearing of impeller: permanently sealed bearing, size 633313.


5, Collector: galvanized sheet, thickness 1.0mm.


6, Blade tip clearance: 25mm, mirror face.


7, Inlet wind protecting net: plastic sprayed steel wire, thickness 2.8mm.


8, Electrical motor:  aluminum alloy frame motor, 380V/220/415V, 1.1KW/0.75KW(1.5HP/1HP), 50HZ/60HZ, 3PH/Single Phase, 4-pole speed, 1410r/m, IP55, class F, efficiency 90%, top/foot mounted, 


9, Motor bearing: cast iron.


10, BeltB-belt and A-belt (Made-in-China and Japan brand Mitsuboshi).


11, Shutters: galvanized board, 0.8 mm thickness while the middle piece thickness 1.0mm. Galvanizing layer, 120g/square meter.


12, Opening system: centrifugal push-push open device.


13, Rivets: aluminum alloy and stainless steel rivets.


 


exhaust fan  parts


 


 


fan  vetalition type


 


01


2.png


 


Qingzhou Duohui New Material Technology Co., Ltd. is a professional supplier of ventilation machinery. focus on the worldwide market.We promise to provide best product with competitive price.
We have strict inspection of the machine before packed,ensure the goods deliveried to your hands are in goods condition.
Welcome to contact me for more details.


1.png


 


FAQ:







1. Are you a factory or a trading company?
We are a direct factory with guaranteed quality and competitive price. Support customer visits, and video talk to check the
factory.
2. How will you guarantee the quality?
For all of our machinery, 1-year guarantee for the core components. We support 24 hrs*365 days online service for technical
guidance.
3. How long is the time of production and delivery time?
According to different types and quantities, the production phase is around 7-30 days. The delivery time is around 7-15 days.






 


0.0167 s.