Share on (1600927408158):



















The first step is to choose colors, materials, styles of shop furniture. Attractive design with a unique idea attracts the eye’s
attention and reminds people of your business.
Secondly, make a 3D design drawing according to the description. It needs about 5-7 workdays to finish a 90sqft cosmetic store design. A single wall shelf at size 1080mm L needs about 2-3 days to make it clear. However, if we have new ideas adding to the design, it takes a longer time.
Thirdly, check the cost of the pharmacy store furniture. When confirming the design picture, we can calculate the cost and confirm the order. Because it shows how many counters to made. You can also share the design for approval.
Finally, complete the construction drawing according to the confirmed design model. Construction drawing contains material details, measurements, circuit plan, separate counters, etc. The construction drawing needs about 2-3 days. The shop is bigger, it needs more time.



New products from manufacturers at wholesale prices