Automatic frozen french fries potatoes production line

Share on:


Price:
Price in USD:Details

Quantity:


Product Overview

Description



Product Introduction


French fries production line



The French fries production line is composed of steam peeling machine, water knife, blanching machine, air drying machine, frying machine, oil leaching machine, freezing machine, packaging machine, etc., with a high degree of automation, can realize continuous, large-scale production, the maximum production capacity of 8 tons/hour


Product equipment structure




Size information


model
Capacity/kg
Type Batch
Heating  methord
TW-100
100
Continuous
Gas,Electric,Steam, Diesel
TW-200
200
Continuous
Gas,Electric,Steam, Diesel
TW-500
500
Continuous
Gas,Electric,Steam, Diesel
TW-1000
1000
Continuous
Gas,Electric,Steam, Diesel
TW-2000
2000
Continuous
Gas,Electric,Steam, Diesel
TW-3000
3000
Continuous
Gas,Electric,Steam, Diesel
TW-5000
5000
Continuous
Gas,Electric,Steam, Diesel


Company Profile


Tinwing
Shandong Tinwing Machinery Manufacturing Co.,Ltd. is professional manufacturer of D1,D2 pressure vessel. Tinwing has complete qualification, advanced equipment,strong technical power,well-found detection means, perfect-stable quality assurance system.We has long been committing to manufacture pressing and curing equipment for composite materials. We creat the new composite autoclave company with numerous colleges, scientific research units,military enterprises joint to design R &D.In the aerospace electronic communications,defense weapon,rail transportation high performance racing,sailing, wind turbine blade,vacuum processing wood modification, building reinforcement,the equipments are widely used in many fields.What's more,the device get good results. At the same time, we can design a reasonable solution for customers according to their requirements.And we also provide the products design, manufacturing, installation,commissioning,maintenance in the whole service line so as to provide qualified products to customers.


Product packaging




FAQ


1.What are the payment terms?
T/T,L/C and trade assurance are acceptable,T/T will be more appreciated,30% deposit before production,70% balance before shipment.
2.What is the delivery time?
At least 2 month after the deposit recipit,depend on how many machines included in the line.
3.How to pack the machine?
Standard packaging
4.How to install after the machines arriving destination?
Our engineer will go to customers site if you need,but need to pay installation fee accord with the contract.


1600934221531
0.0103 s.