High performance cell lines can be obtained and smooth microbial reactors work better

Share on (1600934818476):


Price:$45,000.00

Quantity:


Product Overview

Description







Product Name
Air lift glass fermenter
Material
Glass,SS316L/SS304
Minimum volume
100*90*110cm
Selling point
Airlift fermenters (ALR) are the most widely used bioreactor equipment. This type of reactor has the advantages of simple
structure, no bacteria contamination, high efficiency of dissolved oxygen, and low energy consumption.

1) Widely used for large-scale production of single-cell proteins. However, it is not suitable for culture fluids with high
viscosity or a large amount of solids. The equipment can be widely used in the aerobic fermentation process of antibiotics, amino
acids, enzyme preparations, vitamins, organic acids, etc. It is used in the domestic production of glutamic acid, antibiotics,
xanthan gum, glucoamylase, and citric acid. In terms of environmental protection, it can be used for sewage treatment

2) The gas supply efficiency is high, and the ventilation in the air riser can be greater than the air intake of the bubble
reactor, which is conducive to aerobic reactions

3) Compared with the paddle reactor with stirring paddle, the energy consumption is lower, and compared with the mechanical
stirring fermenter, it can save 70%-80% of electricity and reduce the cost

Stainless steel cylinder combines with glass partly. It uses a large area of highly refractory glass to observe material easily.
Magnetic force stirrer without axes sealing. There is no possibility to leak out the bacteria. The view is spacious. The agitation
system is hanged up. There is no thimble at the bottom.

Control system: 10in touch screen , Siemens PLC control system with control parameters (stirring, pH, DO, temperature, feeding,
gas etc.), data analysis, data logging, data output and printing, overrun alarm, language switching and other functions












Q:Are you factory or trading company?
A:We are a factory.

Q:What's the MQQ?
A:1 unit.

Q:Do you offer overseas service?
A:Yes,We are dispatch engineer to overseas.

Q:Can we visiting your factory?
A:Yes,warmly welcome.

Q:How about your delivery time?
A:1 week to 3 months.Depend on the size and quantity.



0.1974 s.