galvanizing machine equipment electroplating production line electroplating machine supplier

Share on:


Price:$10,000.00
Price in USD:Details

Quantity:


Product Overview

Description



galvanizing machine equipment electroplating production line electroplating machine supplier


Products Description




Pre-treatment equipment
Ultrasonic degreasing equipment , Washing machine , Vibrating polishing machine
After-treatment equipment
Oven , Dryer
External equipment
Rectifier , Filter , Chiller
Water cycle system
Input and output plastic pipes and value
Exhaust system
Air cover, ventilation pipe, Exhaust fan , Acid mist tower, Air box


Product display




Detailed products




Crane
Square steel pipe with 3 layers Epoxy resin paint.Could loading heavy goodsIt's strong.
According to the working process and work efficiency of the production line, the production line is equipped with automatic gantry crane. which has the ability of vertical lifting and high-speed left and right travel.




Hanger:
The matel hangers for Rack /hang plating line , it is customized according to customers' products


Tank:
Our standard PP /PVC plate thickness is 15mm , after serioiusly testing and market research , this is the most cost-effect thickness , there will have a good balance for price and quality .
Besides , we also welcome the customized of its thickness , please note .
PP / PVC welding plating tank
Our plating tanks with the whole strengthen (0.5m/ bar) and details strengthen.
The importance : The strengthen is square iron pipe with PP plate outer welding .
Please note .



External Device


Rectifier:

Filter:

Vibrating Polishing machine



Ultrasonic Cleaner
Water chiller
Drying machine


Exhaust system




The electroplating exhaust gas is sucked by the exhaust hood, and is sent to the exhaust tower by the exhaust fan, and the gas rises from the bottom in the tower. Meantime , the absorption liquid which input the exhaust tower by circulation pump is sprayed from top to bottom, the exhaust gas caused the chemical reaction after reverse direction contact with the absorption liquid on the packing layer in the waste gas tower, then the most of it will be absorbed; After that , after dehydration and defogging through the defogging plate,the purification effect is achieved and discharged into the atmosphere.


Electroplating products




Shipping




The packing list is attached for the customer to check
Package mode : by plywood or shipping by container directly .
Shipping :Ocean shipping
Lead time : 30-35 working days



Company Profile


If you have any questions, please feel free to contact us.

Welcome your inquiry.

Best regard




1600942999086
0.0129 s.