2 м/4 м/6 м стальная кровельная листовая металлическая Цветная оцинкованная стальная гидравлическая гибочная машина для гибочного станка (1600944347592)

Share on:


Price:2 000,00 $
Price in USD:Details

Quantity:


Product Overview

Description


2m/4m/6m steel roofing sheet metal color galvanized steel hydraulic bending machine plate curving press brake forming machinery



Product description


 QQ20180225133938.jpgQQ20180225133943.jpgQQ20180225133947.jpgQQ20180225133952.jpgQQ20180225133956.jpgQQ20180225134000.jpgQQ20180225134005.jpgQQ20180225134009.jpgQQ20180225134013.jpgQQ20180225134020.jpgQQ20180226113534.jpg


 


 Main technical parameters 


If  you have specific requirements, that's no problem,We can meet all your needs.

























































































No. 
1Suitable materialcolor steel sheet, galvanized steel sheet, aluminium sheet
2Material width1250mm or as your required
3Material thickness0.3-0.8 or as your required
4Working speed8-12m/min, can be 20-25m/min
5Main motor power5.5kw with cycloidal with reducer
6Hydraulic pump power4kw
7Electrical control systemPLC control system with inverter
8Shaft diameter75mm
9Roller station15 rows, depend on your panel profile drawing
10Rollerhigh grade 45# steel, hard chrome plating
11Working time24 hours
12workers1-2 only
13Cutting head materialCr 12 mould steel with quenched treatment
14Voltage380V 3Phase 50Hz or as your required
15Weight3.5T
16The machine size7000mm*1500mm*1500mm

 


 


 


 


 


           





Others Profile


All these roof panels are very popular all over the word. It looks very beautiful.you can provide your own profile, coils width ,then we produce the machine according to your request.


drawings.png


 


 


 


 





others machine


We can produce too many types roofing panels roll forming machine ,especially according to your request to produce.you need provide panel drawing,feeding width,effective width,and materials thickness,then we can send you more machine details.please feel free contact me.


 


catalog.png 





Customer visits


Many customers wait until their machines are finished then come to our factory To check their machines.When they are very satisfied.They will order the machine again,because We hope to establish long-term business relationship with our customers.Therefore, we have always attached great importance to the quality of machinery and good after-sales service.


QQ20180419134201QQ20180405130040


 





Packaging & Shipping


 Standard export packing and delivery


1. Main body of roll forming machine and decoiler is nude packing.


2. Rollers, shafts, PLC, pump and cutter are packed with water-proof plastic film, spare parts in carton box.


3. One set of machine needs a 20'container to shipping.


 packaging nudepacking detail7


 





Our Services


 


 





FAQ*


1. what is your guarantee period?


Guaranteed against malfunctions due to manufacturing defects for 12 months from the date of loading.


 


2. Do you provide training for my workers?


The machine has been installed and tested well before shipping. It is easy to operate.


Normally speaking, our customer follows the instruction book and can operate the machine well.?


You can also come to our factory to check the machine and learn how to operate before shipping. It only needs 2 hours and you can operate well.


 


3. I do not know about the machine and do not know how to install it. Can you install the machine in my factory?


If you need us to send engineers to your factory, you will pay for the travel expense such as visa, round tickets, hotel, food Salary of 80 USD per day per person (from departure from our factory, until we are back to our factory). You also need to take care of his safety.


 


4. What is included in the machine?


The process for work: decoiler→feeding→roll forming→measuring length→cutting to length→product to stand


The whole line includes a manual decoiler, roll forming machine and product stand. when you get the machine in your factory, you just need to do following 3 things, and then you can start working.


a. Put the machine on the flat level ground.


b. Inject gear oil and hydraulic oil.


c. Connect 3 phase electric wire.


all.png 




1600944347592
0.0112 s.