Share on (1600948899018):

Hollow pp formwork is according to the principle of structural mechanics, neatly arranged, increased four times support, stronger and more robust;On both sides of the formwork are right angle processing, increasing the bear capacity, construction is more convenient.
Hollow formwork principle also makes the product expansion coefficient small.

| BEIZHU HOLLOW PP FORMWORK | ||||
| SIZE | THICNESS | QTY/PALLET | QTY/20FT | QTY/40HQ |
| 2440*1220MM | 12MM | 70PC | 560PC | 1260PC |
| 2440*1220MM | 15MM | 56PC | 450PC | 1070PC |
| 2440*1220MM | 18MM | 50PC | 400PC | 950PC |
| 2440*1220MM | 20MM | 45PC | 350PC | 850PC |


Features:
1. Light weight, high strength, high hardness, impact resistance, wear resistance.
2. Surface is smooth, bright and clean; Concreting and forming effect is good for Beizhu concrete formwork.
3. No absorption of moisture, no deformation, no mildew; Long-term immersion stratification in the water, no bubbles, sheet size stability, especially suitable for underground and damp environment.
4. Good toughness. Beizhu concrete formwork could be used as cambered special-shaped formwork.
5. Acid and alkali resistance, corrosion resistance; Beizhu concrete formwork is very suitable for the engineering application in coastal areas, mine, as well as seawall. Beizhu concrete formwork needs not do any preservative treatment both in using and storing the formwork, which do not pollute the concrete surface.
6. The reusable time for Beizhu concrete formwork can reach more than 60 times, long service life.
7. Waste products can be recycled and reprocessed, making full use of waste materials. This property can greatly reduce the project cost compared with wooden formwork and bamboo formwork.
8. Environmental protection and energy saving, no pollution. No any poisonous or harmful gas.
9. Demould easily. No need brushing release agent, only tapping, the Beizhu concrete formwork will fall off. Shorten working hours and speed up the construction schedule efficiently.
10. Easy to process. Sawing, drilling and nailing are all available. Beizhu concrete formwork can be combined vertically and horizontally optionally.
11. Easy to remove. Removing is convenient, quick and safe, and the supporting is also easy to operate, advantageous to the organization construction, effectively improving the construction schedule.


1) Durable. Can be reused more than 60 times, 1 set formwork can finish whole high buiding 2×30 floors, save 50% total budget than plywood and metal formwork;
2) Waterproof. Won’t deform and warp, can be used in damp enviroment;
3) Good strength and toughness. Won’t break edges and corners when mould removal, won’t fracture;
4) Need no releasing agent. Because of incompatibility of plastics and cement;
5) Light weight. Easier to carry and release worker from heavy labor. Manual operation, no crane required;
6) Surface need no maintenance. High pressure water jet can be used to flush the surface;
7) High workability. User-friendly, can be nailed, drilled, cut, etc. Compatible with other materials such as plywood, steel, aluminum, etc.

General Operation And Notes Of Instrument:
1. Method of use as well as wooden formwork, Beizhu concrete formwork reinforcement direction with batten direction placed in cross shaped.
2. No need to smear the mold release agent before using Beizhu concrete formwork.
3. When cast-in-place the flat plate, spacing between the keels should be 20 ~ 25 cm, and the spacing between the wall plate and keels hould be 10 ~ 20 cm. BEIZHU Beizhu concrete formwork don't need releasing agent.
4. The seam-line between Beizhuconcrete formwork should be taped.
5. The length of nail should not be too long, generally about 30 ~ 35 mm.
6. The strength to drive nailsshould be moderate.
7. When removing the Beizhu concrete formwork, please start from the small part of one end, the support and the plates should be removed at the same time aiming at preventing the template widespread drops, don't let the corner drop on the ground vertically.
8. The Beizhu concrete formwork accesses to be mixed used with wood veneer, bamboo veneer and other material plate.
Beizhu Group has 30 years Production Experience specializing in construction materials production and research; Beizhu Group has past the certificate of ISO9001:2008 International Quality System in 2015; With excellent R&D team, Beizhu has more than 80 patents; With advanced equipment, Beizhu can provide good product and service.


Q: Are you a factory or trading company?
A: We are manufacturing and trading combo.
Q: How can I get the sample?
A:We provide sample free of charge 3-7 work days.
Q: What payment terms do you do?
A: 30% T/T as down payment, the balance paid by T/T before shipment
or 100% irrevocable L/C At sight.
Q: What is your MOQ for Beizhu concrete formwork?
A: We have some stock for normal size, so it depends on your requirement.
Q: How long is your delivery time?
A: 10-15 work days.
Q: How to pack the product?
A: On pallet and carton or as customers’ requirement.
Q: How many quantity can load for one 20/40 container?
A: For 18mm thickness, 400PC/20GP container, 900~1000PC/40HQ container.
New products from manufacturers at wholesale prices