PV Solar Module Encapsulant Transparent EVA Film for Solar Panel Laminating

Share on (1600950236768):


Price:$1.30-1.50

Quantity:


Product Overview

Description



Product Description


1.Excellent optical performance;
2.Less lamination time, high encapsulation efficiency;
3.Excellent durability performance(Including high temperature/humidity resistance and UV test);
4.Excellent performance for Anti-PID;
5.Excellent performance for Anti- Snail track.




Details Images



It is the ultrafast cure EVA, with excellent Anti-PID Anti-Snail track. Compared to normal EVA, the Lamination time of ultrafast cure type is shorter, which can improve module production efficiency greatly.




Specification


Performance:
Property
Unit
Test Method
High Transparent
UV Cut off
Width
mm


HIUV method
970-1300
970-1300
Thickness
mm

0.60±0.10
0.60±0.10
Optical Transmission (290-380nm)


>70
<30
Optical Transmission (380-1100nm)
%

>91
> 91
Gel content
Gel%

HIUV method
>70
>70

Shrinkage Rate ( 120°C, 3min)

%

MD≤4.0
MD≤4.0



TD≤1.5
TD≤1.5
Peeling Strength With Glass
N/cm

ASTM D903
>60
>60
Peeling Strength With Backsheet
N/cm

>50
>50
Volume Insulating Resistance
Ω. cm
GB/ T1410-2006
≥1x10∧15
≥1x10∧15
UV Light Resistance (120kWh/ m2)
ΔYI
ASTM G154
<5.0
<5.0
Heat/ Humidity Resistance(80°C.85%RH,2000hr)
ΔYI
ASTM E313
<5.0
<5.0


Packing & Delivery




Factory


NUUKO POWER CO.,LTD
With nearly 10 years of experience in the photovoltaic industry, our factory has an automated production workshop with 3GW production capacity.
High quality products grade A with with competitive price. Also provide OEM service for clients, help to design Logo and other design service.
NUUKO has created a "closed-loop" development model of solar module R&D and production, and distribution cooperation.



NUUKO Solar Panel
Process of Production


Soldering
Automatic Layup
Automatic Taping


EVA & Backsheet Loading
EL Test before Lamination
Rotation Visual Inspection


Framing
Flash Test & EL Test
Automatic Labeling


NUUKO Company
Shots with Customers from Worldwide




Project


Palermo, Italy
Capacity: 150KW
Module Type: NKP330-72
Time: Jun.10th,2019
Oslo, Norway
Capacity: 50KW
Module Type: NKM305-60
Time: Aug.3rd,2020
Laem Chabang, Thailand
Capacity: 250KW
Module Type: NKM445-144M6
Time: Mar.7th,2020




Shandong, China
Capacity: 5MW
Module Type: NKM450-144M6
Time: Oct.8th,2020
Hanoi, Vietnam
Capacity: 500KW
Module Type: NKM450-144M6
Time: Apr.6th,2019
Henan, China
Capacity: 50KW
Module Type: NKM440-156
Time: Apr.27th,2020


Certifications




FAQ


Q: Do you have any experience manufacturing products for our industry?
A: We have more than 10 years experience in PV industry.

Q: Can you provide customization options for your products?
A: Yes, we provide OEM Service for you.

Q: What are the advantages of your company?
A: We have own factory, and we also cooperate with other Tier 1 brands, aiming to provide customers with competitive prices and more choices.

Q: May I have a piece of sample to check the quality?
A: Welcome to place the testing order to check the quality or for testing.

Q: How about the delivery time?
A: About 15-20 working days after receiving your payment.
(The specific delivery time depends on the items and the order quantity.)

Q: Where is the port of loading?
A: Shanghai or Ningbo port.




0.1759 s.