7.5kw Power Prestressed Post tension Galvanized Steel Strip Metal Corrugated Pipe Spiral Duct Making Machine For Bridge

Share on (1600952392487):


Price:$3,600.00 - $3,800.00

Quantity:


Product Overview

Description



Product Description


7.5kw Power Prestressed Post-tension Galvanized Steel Strip Metal Corrugated Pipe Spiral Duct Making Machine For Bridge


The pipe making machine is a device for producing metal corrugated pipes with prestressed concrete reserved channels. It uses galvanized or cold-rolled steel strips (black belts) to roll them into double corrugated shapes and then undercut them to form corrugated pipes. The machine is small in size and high in efficiency. , Simple operation and maintenance, suitable for centralized use on construction sites or factories.

The pipe making machine is driven by a non-variable speed motor, driving the driving shaft core shaft. A helical gear on the core shaft meshes with two spur gears to pull the steel strip. After the steel strip is pressed and flanged by four sets of rollers, it is wrapped around the core. On the shaft, the pressing wheel bites, the compacting wheel embosses and the compacting wheel compacts it to become a spiral bellows.




Samples






Feature


* Low power consumption
* Wear well with stable performance
* Saving material, high productivity.







Working flow




Specification


1
Diameter
35-135mm
2
Thickness
0.2-0.35mm
3
Strip width
36mm
4
Strip feeding speed
1-30m/min, adjustable
5
Suitable material
Galvanized steel strip
6
Main motor power
7.5KW
7
Cutting motor power
4KW
8
Lubricnt motor power
0.125KW
9
Dimension
1420x 1800 x 1400mm
10
Weight
About 600KG


Packing & Delivery




Company Profile




FAQ


1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.

2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc

3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other
payment term, like L/C, DA, D/P etc

4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.

5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.


0.1977 s.