We now manually put the poles into the rack one by one, which can effectively reduce the degree of scratches on the poles. During the installation process, the workers will carefully check whether the pole is scratched. Once the pole is found to be scratched, it will be replaced in time.
Open will make noise issue/ Poles falls out issue
Upgraded the pole stability
Regarding the poles falls out issue, when you open the rack, the pole will be firmly fixed in the hole and will not move easily. This can also effectively reduce the noise problem.
New upgrade rods
We use the best spray powder on the surface, the new upgrade rods, we spray another layer on the surface, which will better avoid the noise problem.
New upgrade rods
We use the best spray powder on the surface, the new upgrade rods, we spray another layer on the surface, which will better avoid the noise problem.
Optional pole
Aluminum 5 Rods
Aluminum 6 Rods
Stainless 5 Rods
Product packaging
Including screws, instructions, drilling template
Another layer of blister on the inner box (Protect inner box)
Put inner boxes inside the outer box (Double protection)
Customer Photos
Company Profile
Zhejiang Soyoung Co., Ltd. has a plant area of 20,000 square meters. The company currently has more than 80 employees and 15 managers. We are located in Yongkang, the hardware capital with convenient transportation, adjacent to Hangzhou and Yiwu. city. Our seaport is Ningbo or Shanghai. Average annual sales of 50 million US dollars.
Exhibition
FAQ
Q: When can we get your quotation ? A: We can deal with your enquiry within 1 Hour, if you are urgently to our quotation, please call us so that we can reply your enquiry priority.
Q: How can we get a sample to check your quality? A: After price confirm, you can require for samples to check our quality. Sample cost will be charged but we can refundable once order confirmed.
Q: Can you do the design for us? A: Yes, With 10 years experience sales on ladders. we have our own R&D team for product, we can do all product as your own idea and packing design including labels , show card, brand, logo, display boxes etc.
Q:How long can we get the sample? A:After you pay the sample cost, the samples will be ready for delivery within 7 days. The samples will be sent to you by express and arrived in 3-4days. You can use your own A/C or prepay us if no A/C by express.
Q:What about the lead time for mass production? A:Normally we can finished 1*40HQ within 20-25days . But based on the quantity of our orders.