Star Union 36v 250W high torque electric bike rear front hub motor for ebike

Share on (1600958431802):


Price:$300.00 - $350.00

Quantity:


Product Overview

Description







CM2502 Hub Motor System Kits Introduction:
The System Kits Including:
1PC* Motor CM2505
1PC* Display WUXING(Star Union) SW102
1PC* Headlight WUXING(Star Union) QD260
1PC* Rear Light WUXING(Star Union) WD216
1PC* Switch WUXING(Star Union) DK430
1PC* Controller
1Set* Cables




Weight
3.2kg
Max Torque
125N.m
Pedal Sensor
Speed & Torque sensor
Certificate
CE/FCC/ROHS/UL2849








More Hub Motor and Application












Sample/Order Package:
Sample Packing: motor, cable, and other accessories placed in foam box. Other parts are stuck in the corresponding card slot. Then
cover the top with foam board.

Order Packaging: Place the four motors in foam boxes, and the rest parts of ebike (throttle, front light, Hydraulic disc brakes,
sensor, controller, switch)




After Sales Services
Product warranty mechanism:
1. If the product is damaged within 12 months from the day of selling and is already within the scopeof warranty, repair and replace it New accessories, or replace the whole motor;
2. Calculated from the day the product is sold, it is damaged within 24 months after more than 12 months and belongs to the warranty In the enclosure, the qualified old parts or qualified old machine will be replaced by combining the existing resources of Star Union;

Service efficiency:
1. Reply within 24 hours;
2. Timely follow up and reply to each node of after-sales problems, and provide temporary solutions;
3. After-sales replenishment and maintenance preparation delivery cycle: 2~3 weeks;


Sample/Trial Order/Batch Order Delivery Time
For samples (less than 5 sets):
a. If it is normal model, our delivery time is 7-12 days.
b. If it is modified version (Such as we modify the spec.), our delivery time is 30 days.

For trail order(less than 500 sets): Our delivery time is within 30 days. (At present, we arrange the materials preparation)

For formal order(more than 500 sets): a. If it is the first cooperation, delivery time is about 45-60pcs. b. If long time
cooperation, our delivery time is within 30 days in the case of preparing materials in advance.




Capacity
Just on an assembly line, we can make 50 pcs motors per day. For a month, it is likely up to 1,500 pcs per month. We expect to reach NINE production and assembly lines by the end of 2022.
Based on it, in effect our capacity top 450 per day. For a year, the maximum is more than 150,000 pcs per year.
















0.2075 s.