Share on (1600958787805):
Basic Info.
| Frame material | Aluminum 6061-T6 |
| Platform size | 1.22m*1.22m, 1.22m*2.44m, 1m*1m, 1m*2m |
| Platform material | laminated plywood 18mm / Toughened glass / Plexiglass / carpet / rubber /etc. |
| Aluminum Frame tube | Main tube: 50*3mm Brace tube: 25*2mm |
| Platform color | Red / black / brown, etc. |
| Adjustable height | 0.4m-0.8m, 0.6m-1.0m, 1.0m-1.4m, 1.6m-2m... |
| Loading capacity | 800-1000kg/sqm for different type of stage |
| Style | Any style are available |
| Optional accessories | Guardrail, step-stair, ramp, aluminium platform trolley, dolly, skirts |

Aluminum mobile stage


Aluminum semi circle stage




Aluminum circle stage round stage








Aluminum stage 1.22 x 1.22M / 4' x 4' per unit:


Aluminum stage 1.22 x 2.44M / 4' x 8' per unit:

Assembly Method:

Platform Detail:
• Water resistant Industrial finish.
• Lightweight and compact for easy setup, transport and storage.
• An aluminum lattice structure construction with a weight capacity of up to 800 KGS/sq. meter.


Stage Brace Detail:
• Lightweight and strong tubular aluminum construction.
• Side Braces are shared between adjacent platforms.
Our aluminum stage outside wouldn't get rusty at all!

Stage Leg:
• Legs are shared between adjacent platforms.
• Lightweight legs can be adjusted at 24, 32, 40 or 48 inches
(60, 80 100 and 120cm) using interchangeable leg extension tubes.
• Accessories such as rubber mats, slope adjustment wedges and spikes
for soft ground and slope applications are available.

Successful cases of stage platform for your reference!

TUV Certificated


| Packaging Details | Bubble film,Woven bag. |
|---|---|
| Delivery Time | 5-7 working days after confirmation. |


1.Where are you?
♦ We are located in Baiyun District, Guangzhou City, Guangdong Province,China. It's about 30 minutes by taix from Guangzhou airport to our factory.
2.What are the payment terms?
♦ We accept T/T, Western Union and Trade Assurance via Alibaba.
3.What about the delivery time?
♦ It's up to your order quantity,normally 5 to 10 working days after payment comfirmed.
If your need it in urgent, we will make a priority arrangement for your order.
4.Where is the port of loading?
♦Port Huangpu in Guangzhou and Port in Shenzhen.
Dear clients,we have a professional team serving you,welcome to contact us.
New products from manufacturers at wholesale prices