Moldable Orthotic Insoles Poron Oven Moldable Thermoformed Insoles Ideastep Heat Moldable PP Shell 3/4 Insole

Share on (1600999378654):


Price:$0.91-1.03

Quantity:


Product Overview

Description



Products Description




Specification


Type
Heat Moldable
Brand Name
IDEASTEP
Place of Origin
XIAMEN,Fujian,China
Model No.
CSS757TPU
Material
TPU
Size
A:15.8cm, B:16.3cm, C:16.9cm, D17.5cm, E:17.9cm, F:18.7cm, G:19.2cm, H:19.8cm.
MOQ
500pairs
Feature
longitudinal arch supporting, heated reshaped to match foot exactly for nice fitting and support control the subtatalar joint and midtarsal joint
Package
1. Support packaging with OPP bags, PVC bags, POLY bags, PP boxes, PVC boxes, cartons, etc. 2. Depend on buyer request.


CONTACT US




Company Profile














FAQ


A) How could I get a sample?
Please advise your company name, address and phone so that we can get you a courier cost of sample for reference

B) Sample time?
Existing items: Within 15-30 days.

C) Whether you could make our brand on your products?
Yes. We can print your Logo on both the products and the packages if you can meet our MOQ.

D) Whether you could make your products by our color?
Yes, The color of products can be customized if you can meet our MOQ.

E) How to guarantee the quality of your products?
1) Strict detection during production.
2) Strict sampling inspection on products before shipment and intact product packaging ensured.

F) What is the process of custom-made insoles?
1. Get foot data, the acceptable forms include:
1) 3D foot scan data STL format (or other formats)-we use DELCAM software to parse
or
2) Bio-form Box

2. Make Orthotic according to the client's prescription

3. Use the following two different technics to make products as per client requirements
1) CAD-CAM ORTHOTIC by CNC MILLING PROCESS
2) Heating and Vacuum pressing process

4. Pack according to customer requirements and arrange express delivery to the door

5.The average cost is EXT $60/pr for a custom-made Orthotic.

7.Time of delivery:
Custom Orthotic insole 3days in production,
Transportation takes 5-7 days depending on the situation


0.1556 s.