Share on (1601002362210):

















Material | SPTE, Nickel silver, stainless steel, aluminum, copper ect |
Surface Treatment | Tin plating, Zinc plating, Nickel plating, Anodized, Powder coating, Sandblasting, Heat treatment |
Thickness | 0.1-3mm |
Tolerance | ±0.02mm |
Package | PE bag, Tray, Reel, Tape&Reel, Carton |
Lead Time | Tooling: 30 working days Mass production: 20-35 days |
Payment Terms | 50% deposit, balance before shippment |






New products from manufacturers at wholesale prices