Q1: The process of complete an order?A1: understanding of what your lighting project >> Create a detailed product design report(carefully considering the design, performance and budget) >> Sample Design >> After confirming the sample, mass production and shipping
Q2: What should I do before assembling?
A2: -tear the protection film out
-clean the sheets with an air gun
-wear gloves (especially for LGP)
Q3: Does diffuser have direction?
A3: The pattern must be outside
Q4: Which Storage environment is recommended?
A4: -Dry
-Avoid moisture & direct sunlight
-A black cover on pallet is also an option
Q5: Which way can I choose for shipping?
A5: by Air, Sea & Train
Q2: How long does it take for order preparation?
A2: 1~2 weeks (in stock)/ 3~4 weeks (without stock)
Q3: How do you pack the sheets?
A3: Process as below
1.Place corrugated paper on top of the pallet
2.Cover and surround goods with PE films after stacking mother sheets
3.Use angle boards around the edges of the goods (if size under 600x600mm)
4.Use wrapping tape to fix goods on pallet