110V/220V/12V/24V Food Warmer Stainless Steel Container Electric Lunch Box With 2 Compartments Inner for Car Truck

Share on (1601006964440):


Price:$6.50 - $7.60

Quantity:


Product Overview

Description







45° leak-proof 3 seconds

Our electric lunchbox added Sealing ring,which can perfectly solve the problem of side leakage.
60W Fast food warmer lunch box

Turn on the power for about 25-40 minutes and you're ready to enjoy a hot meal. No need to wait in line to heat food in the microwave, silent heating and time saving.
Cell phone holder use

The hidden cutlery storage box not only stores cutlery, but also serves as a cell phone holder, allowing you to watch videos while you eat.


Products Description




Product Information:
Note :

Wash food containers before use.
Summer: 20-40 minutes
Winter: 25-45 minutes
CAR/TRUCK use: 50 minutes

Specifications:

Size:240×175×120mm
Watts: 60W
Rated Volts: 12V/24/110V/220V
Material:304 Stainless Steel + Food Grade PP Plastic
Certification:CE,ROHS,LFGB,CB
Uses:Car/Truck/Home/Office








Application Scenarios




Company Profile




Production Process




Exhibition




Certifications




FAQ


1.What is your MOQ?
A: Usually our MOQ is 3,000pcs. But we accept lower quantity for your trial order. Please feel free to tell us how many pieces you need, we will calculate the cost correspondingly, hoping you can place large orders after checking quality of our products and know our service.
2.What is your payment term?
A: Our normal payment term is T/T 30% deposite after order signed and 70% against copy of B/L. We also accept L/C at sight.
3.How many colors are available?
A: We match colors with Pantone Matching System. So you can just tell us the Pantone color code you need . We will match the colors. Or we will
recommend some popular colors to you.
4.How long is the sample lead time?
A: For existing samples, it takes 2-3 days. They are free. If you want your own designs, it takes 5-7 days, subject to you designs whether they need new printing screen, etc.
5.How long is the production lead time?
A: It takes 30 days for MOQ. We have large production capacity, which can ensure fast delivery time even for large quantity.




0.1916 s.