OK Prefab Fast Build 20ft 40ft Modular Camping Box Wall Window Fully Assembled Small Tiny Home Officer Folding Container House

Share on (1601013198532):


Price:$799.00 - $899.00

Quantity:


Product Overview

Description





Products Description


External Size
5800mm(L)*2500mm(W)*2390mm(H)
Internal Size
5650mm(L)*2350mm(W)*2270mm(H)
Roof Insulation
Glass Wool
Wall Panel
50mm thicknes EPS/ROck Wool Sandwich Panel
Floor
15mm MGO board
Door
860mm(W)*1980mm(H) Single Open Steel Door
Window
950mm(W)*1200mm(H) Aluminum Alloy Window
Frame
Galvanized Steel
Material
All Steel Galvanized&Power Paint






















1.Q:Are you the Factory or Trading Company?
A: We are the factory with more than 5 production lines which is located in Guangzhou for prefab house and portable toilets,Shanghai and Foshan for container houses and Dongguan for steel structure.


2. Q: How about your delivery time?
A: Normally, the delivery time is as follows: Prefab house: 7-15days, Container house: 10-15days, Steel structure:
30-35days,Portable Toilet: 5-10days.


3. Q: What about the Month Capacity?
A: Prefab house: 100,000m2, Container house: 1000units, Steel structure: 2000tons, Portable Toilet: 2000units.


4. Q: What's the minimum order?
A: Prefab house: 100m2, Container house: 3units, Steel structure: 200m2, Portable Toilet:5units.


5. Q: What's you payment terms?
A: T/T;Cash;LC.For standard products:30% deposit before delievery,70% balance before delivery.Customized Products:Depands on the
design.


6. Q: What kind of technical drawings could you provide?
A: We could provide three-view drawing, 3D picture, blueprint, foundation, plumbing, electrical, communication, fire alarm,
installation, furniture and so on.


7. Q: What is the lifespan and warranty period?
A: The lifespan for Prefab house is 10 to 15years, Container house is 15-20years, Steel structure is 30-50years and Villa is
50-90years. The warranty period for all the house is 12months from the delivery.


8. Q: Could you supply the service of installation?
A: Yes, we have experienced supervisors who could go to guide the installation at any time. Meanwhile, we have skilled
installation team who could finish some turn-key projects.


0.1976 s.