Bomba Hight Pressure Farm Irrigation Power Engine Delivery Waterpump Water Pump Machine

Share on (1601015283586):


Price:$51.00 - $55.00

Quantity:


Product Overview

Description







Product Paramenters




Model
JL-WPG20
JL-WPG201
JL-WPG202
JL-WPHG20
Gasoline Engine
168F(6.5HP)
170F(7.0HP)
170F(7.0HP)
170F(7.0HP)
Starting System
Recoil
Recoil
Recoil
Recoil
Inlet Pipe Diameter
50mm(2")
50mm(2")
50mm(2")
65mm(2.5")
Outlet Pipe Diameter
50mm(2")
50mm(2")
50mm(2")
50mm(2")
Maximum Suction Head
7m
7m
7m
7m
Maximum Lift Head
27m
50m
72m
60m
Maximum Flow
30m3/h
29m3/h
29m3/h
29m3/h




Main Products






Application Field




Company Profile




Jialong Baofeng was founded in 2009, it is a modern enterprise which specializing in producing gasoline engine, gasoline water pump, gasoline power sprayer, gasoline generator, car washer and other agricultural products with more than 10 years experience. Our products have attained CE, ISO9001 certifications, and have exported to Europe, South America and Southeast Asia for more than 24 countries.
"Your Success, Our Glory", Jialong Baofeng provides a perfect marketing network and after-sales service system, we are available to visit customers' company and help customers do marketing plans and technical teaching face to face.

"Quality First, Service first, Innovation First and Win-win First". We are sincerely welcome friends to work together with us, and hand in hand to create a win-win cooperation in near future. Jialong Baofeng, your good partner!




Certificates




Exhibition




FAQ




Q: What products are you manufacturing?
A: We manufacture and exporter of gasoline engine, gasoline water pump, gasoline power sprayer, gasoline generator, car washer and other agricultural products.

Q: Are you a factory or a trading company?
A: Manufacturer, we focus on the development and production of agricultural machinery more than 10 years.

Q: Whether to provide customized services?
A: Of course, OEM and ODM.

Q: How is your quality control?
A: We have a strict quality control system, from each spare part to each complete machine, to ensure that each product is qualified before loading.

Q: What about the lead time for mass production?
A: Generally, it will take 15-20 days after receiving your advance payment. Some is 25-30days. The specific delivery time depends on the items and the quantity of your order.

Q: How about warranty?
A: It's within 1 year after goods is discharged in the destination.


Contact Us




0.207 s.