Technology description | ||||||||
1. There are 3 heating & recirculation zones and 7 thermoelectric couples. | ||||||||
2. The lehr is equipped with 6 full-automatic controlled 2-staged burners, which is assembled with imported parts. | ||||||||
3. An energy-saving cooling fan is mounted at the end of the tunnel. The power of the motor of the fan is 1.1KW. | ||||||||
4. The drive motor of belt is controlled by an inventor. The speed of belt is 150-650mm/min. | ||||||||
5. There are 7 instruments and 7 thermocouples on the control cabinet, and the control cabinet is equipped with fault alarm device. The temperature control instrument in the heating area of the control cabinet adopts Japanese SHIMAX, and the control accuracy of the instrument in the heating area is ±2℃ | ||||||||
6. Way of belt returning: inside the heating tunnel | ||||||||
7. Width of belt:1920mm | ||||||||
8. Height of belt ( top/ground): 960mm | ||||||||
9. Passing height in the tunnel:400mm | ||||||||
10. Total length of the lehr:25550mm | ||||||||
11. 3 circulating fans, the material of impeller is stainless steel. The power of the motor of a circulating fun is 2.2KW | ||||||||
12. Materials of insulation are aluminium silicate. The temperature of the external surface of the lehr must be lower than the ambient temperautre plus 20℃ | ||||||||
13. The maximum service temperature of annealing furnace shall not exceed 650℃. | ||||||||
14. Power supply: 3 phases, 380V, 50Hz | ||||||||
15. Other auxiliary facilites Mold preheating chambers are set on both sides of the furnace body in the first insulation area to preheat the mold. The open area is equipment with a mesh belt cleaning roller to clean the mesh belt There are escalators to facilitate personnel to climb the furnace body Wire and cable equipment need prepared by the buyer. | ||||||||