Hospital S Curved Straight Catheter Medical Urology Urethral Dilator Set For Hospital Ureteral Dilator Set Used For Dilation

Share on (1601024930822):


Price:$55.00 - $60.00

Quantity:


Product Overview

Description





Product Description
Product Name
Urethral Dilator Set
Materials
Medical grade materials
Color
Blue
Package
Paper
Certificates
CE,ISO
Feature:
1.Smooth surface for effortless dilator advancement across tight strictures
2.Taper tip design,the lumen of conical head fit tightly with the 0.038" guidewire,reduce trauma
3.Embossed sizes allow for quick identification and size selection
















0.2053 s.