1 short period of construction. The aluminium form work system is in the line of quick dismantling from system. It is more cost efficient to save your management cost in that one layer can be completed in four working days so the construction works can be conducted in a swift manner, accelerating the site works.
2 Highly reuse rate, reducing the average cost.
3 Construction more easily, conveniently and effectively.
4 Smoother surface of the concrete after removel.
5 supporting system more simple.
Our workshop and deep process centre
1 High precision cutting
2 Lasering welding
3 CNC drilling
We have almost the largest annual capacity in China and we have sufficient formworks in stock ready to ship!
We will make delivery ASAP after the receipt of your order.
Constrction Site
Company introduction:
Shandong Huajian Aluminium Group
1 located at the Aluminium Capital of China ----linqu County, Shandong province
2 nearly 10000 workers
3 Annual capability of 700000 tons
4 Biggest aluminium formwork industry park in China
5 Export more than 40 countries.
Our extrusion process workshop
We have 106 production line which is the biggest in China, and our new industrial plant is being built.
High quality control
Our company standard is higher than national standard which meet many standard in Europe.
Inspection before storing
Our products are after stictly inspection before moving to the warehouse.