Share on (1601035672026):
| Marine equipment Stainless steel 1kg 2kg 2.5kg 3kg 3.5kg 5kg 10kg 15kg 20kg 25kg 30kg 50kg bruce boat anchor | |
| Material | Marine grade 316 stainless steel |
| Surface | Mirror polished |
| MOQ | 1 piece, sample order is welcomed |
| Delivery | By express or by sea |
| Lead time | 3-5days if had ready bruce anchor |
| Supplier type | We are factory, established in 2006 |
| Contact us | Send us inquiry to neosunhardware2(at)castchina.cn |









NEOSUN was founded in 2006,as a trustworthy Marine & Architectural Hardware manufacturer, we supply
quality customized products using lost wax investment casting, and have significant experience managing
any size metal casting run from one piece projects to thousand detailed parts having weights ranging from
a fraction of few grams to eighty kilograms. We also offer parts complete to print, including tooling design
and making, investment casting, CNC machining, electro-polishing, vibratory finishing, hand bright, satin
and mirror polishing, electro plating, power coat, ano-dizing, heat treatment, assembly and other operations.
ISO9001:2008 Quality Management System Certificate

PROCESS
Wax Injection: Wax replicas of the desired castings are produced by injecting tooling with wax. These replicas are called wax patterns.
Assembly: The wax patterns are attached to a central wax runner bar, to form an investment tree.
Shell Building: The shell is built by immersing the tree in a liquid ceramic slurry and then coating in a refractory product. Up to 5 layers may be applied in this manner. This stage is the creation of the “Investment mould”.
De-Wax: Once the ceramic shell is dry, the wax is melted out, using an autoclave creating a negative impression of the assembly within the shell.
Casting: The investment mould trees are fired in an oven and pulled out while hot. The shell is then filled with molten metal by gravity pouring. After the mould has been filled, the molten metal is allowed to cool and solidify into the shape of the final casting. Cooling time depends on the thickness of the part, thickness of the mould, and the material used.
Knock off: When the metal has cooled and solidified, the ceramic shell is broken off.
Cut off: The parts are then cut away from the central runner bar using a high speed cut-off saw or band saw.
Finishing: Finishing operations such as grinding or sandblasting are used to smooth the part at the gates. Heat treatment to the final part.
Inspection: All parts are inspected for quality and shipped to the customer.

How to contact with your company?
Please send email to neosunhardware2(@)castchina.cn,
or whatsapp to 0086-18654689218
or skype for jose-neosun to send me the drawings and details.
What does your company need for a quotation?
Drawing or sample, together with relevant information, such as material quantity, weight.
Which kind of format of the drawing?
PDF, IGS, DWG, STEP, etc
What if we do not have a drawing?
We can duplicate your sample and make drawing for your confirmation.
How soon can I get a sample?
4 weeks for mold and sample, 5 days for express.
Can I visit your company?
Yes, sure, welcome your visit anytime. We will book hotel and pick you up from airport.

New products from manufacturers at wholesale prices