China economic prefabricated light gable frame building workshop construction material steel structure warehouse

Share on (1601039458476):


Price:$39.00 - $79.00

Quantity:


Product Overview

Description



Product Description




Advantages

·The structure is strong and durable, the architectural appearance is novel and beautiful, the quality is reasonable, and the economic benefit is obvious.
·The layout of the cylinder is free and flexible, which can meet the construction and operation requirements under different climatic conditions.
·The light steel structure is light, fast and efficient.Site construction assembling is convenient and quick, to save the construction cycle

The scope of use of steel structures:
A. Warehouse/Storage
B. Factory /Workshop
C. Agriculture Barn
D. Retail Store
E. Repair/Mechanic Shop
F. Office Space
G:Garage/ Hangar
H. Animal Farm (please confirm what kind of animal)





Main Parts
Item Name
Specification


Main Steel Frame

Steel Column
Q235B, Q345B
H shape, Box, Steel pipe, Hot rolled sheet

Steel Beam
Q235B, Q345B
H shape, Steel Truss, Hot rolled sheet

Brace
Q235B, Q345B
Steel rod, Steel pipe, Angle steel
Roof Purlin
C or Z shape, Steel purlin


Supporting System

Wall Purlin
Q235B, Q345B
C or Z shape, Steel purlin
Roof
Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool etc.,
Wall
Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool etc.,


Accessories
Bolts
Ordinary, High strength
Gutter
Galvanized Steel plate, Stainless steel
Windows
Aluminum alloy-Glass, Aluminum alloy-shutter, PVC
Doors
Sliding or Rolling door
Downpipes
PVC pipe, Color steel pipe
Edge Cover
Made of color steel sheet thickness 0.5mm
Ventilator
Stainless steel
Crane
Crane in 5 tons to 30 tons




Products Show








Our Service


Engineer Team

Our experienced team of engineers design a reasonable plan for you.

Excellent Sales

Our salesman will answer any questions for you within 24 hours.

Construction Team

We have a building team that can go to your site and build for you..



Our Company


CLADDING MATERIAL WORKSHOP

This workshop mainly produce the metal sheet, sandwich panel, bending parts and purlin.

MAIN STEEL FRAME WORKSHOP

This workshop mainly produce the H steel column and beam, and other connecting plates



Production process


1. Cutting
2. Assembly
3. Submerged Arc Welding


4. Straightening
5. Shot Blasting
6. Packing&Delivery


Our Certifications




Honor & Prestige

After 16 years of development, our products and services have been recognized by customers both at home and abroad. In some African countries, we are the only suppliers of our customers.The important thing is that we are constantly improving our process to improve the quality and production capacity of our products.



Customer Photo


Visitors from Australia

After our first successful cooperation, our Australian customers visited our factory and production line. After the visit, we confirmed the new cooperation project. They hope to have deeper cooperation with us in the future.



Ethiopia customers visit

During The Canton Fair, From Ethipioa friends visit our factory,They examined our production capacity, quality control, and delivery time respectively, and confirmed the specific orders after the visit.



Visitors from New Zealand

They are sellers of steel garage. They want to find new suppliers from China. After examination, we stand out from 4 suppliers and become their new suppliers.
The picture shows that they are looking at our building material factory.



FAQ


Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 10-15 days if the goods are in stock. or it is 25-35 days if the goods are not in stock, it is according to quantity.

Q: What are the advantages of your prefab building ?
A:Light weight,wind resistance,anti-seismic,fire proof,sound proof,environmentally friendly, quicker to build, cost effective etc..

Q: What is your terms of payment ?
A:L/C or TT(30% prepaid as deposit,The balance 70% before shipment)


0.1917 s.