Prefab easy insulation metal building structure to construct warehouse office

Share on (1601044498407):


Price:$45.00 - $90.00

Quantity:


Product Overview

Description









——WHY CHOOSE US——




——PROJECTS IN WORLD——


MULTI-STOREY BUILDING
IN PHILIPPINES
HEAVY WORKSHOP
IN AUSTRALIA
STEEL WAREHOUSE
IN GERMANY


STEEL BUILDING
IN ZIMBABWE
FACTORY WAREHOUSE
IN MALAWI
SHOPPING MALL
IN PHILIPPINES


PREFABRICATED SHED
IN ZAMBIA
PREFAB WAREHOUSE
IN CANADA
AIRPORT TERMINAL BUILDING
IN MALDIVES


If you are interested in our products,you can contact us at any time.




——PRODUCT PARAMENTERS——


Items
Specifications
Main structure
PEB Welded H-shaped steel or hot rolled steel, Q355 or Q235
Anti-rust protection
Hot dip galvanized or anti-rust painting
Purlin and girts
Cold rolled C or Z steel, Q355 or Q235
Roof and wall
Single layer steel sheet or sandwich panel
Gutter
Heavy duty galvanized steel
Downpipe
PVC
Door
Sliding door or roller shutter
Windows
PVC or aluminum alloy
Other components available upon request. Please provide the following information for detailed custom design.




——QUOTE INFORMATION——


with help of modern designing softwares such as AUTOCAD, PKPM, 3D3S, SAP2000, Tekla structures(Xsteel),we provide full designing and detailing service to all customers.
Click above for free design drawings
24 hours online service for you




——QUALITY ADVANTAGES——




——PRODUCTION PROCESS——




——INSTALLATION CONSTRUCTION——




FAQ
1. Do you provide on-site installation service?
we can provide Installation guide service based on customers' request.
2.What's your delivery time?
Salesman will confirm the time accordingly, large order should communicate with order management department in
advance. Normally, delivery time is 30days after receiving deposit. Large order delivery time should be arranged separately.
3.How to control the quality of your product?
a. quality of the design: think about possible problems in advance and provide a high-quality design solution.
b. quality of the raw material: choose the qualified raw material
c. quality of the production:precise manufacturing technique, experienced workers, strict quality inspection.
4. If there is a clear service life of your products?
If have, how long? Under conventional climate and environment, steel structure whole building 10 years, main structure
15 years, protecting system 10 years.
5. What designs do you have in different climates (How can the products adopt to different climates)?
Strong wind region: improve the wind-resisting ability of the internal structure. Cold region: increase the thickness
of the wall, or use good insulation material, improve the anti-pressure ability of the structure. High corrosion region: use
corrosion resistant material, or paint anticorrosive coating.




0.201 s.