CT 339 Can Tap Open Valve r134a Refrigerante Bottle Opener Air Conditioner Tools Freon Refrigerant Can Opener

Share on (1601044992856):


Price:$0.90 - $1.40

Quantity:


Product Overview

Description



Product Description




Product Name
Air Conditioner Can Tap Open Valve
Technics
Forged
Thread Size
SAE 1/4''
Materal
Brass
Model
DF-149
Weight
70g
Usage
  R410 R22 refrigerant
Connection
  1/4SAE
MOQ
100 Piece/Pieces
Package
1. Inner packing: opp bags, 100pcs/bag with a sticker, stickers can be printed as per buyer's requirements
2. Outer packing: standard export cardboard cartons and reinforced with straps
3. Other customized packing ways negotiable
Structure
Control


R22 Refrigerant Air Conditioning 1/4"Safety Adapter

Good-end CNC machine tool processing, a number of parts of the connection can ensure that it is not leaked.
Activities thimble can accurately control the air conditioning high and low pressure valve needle.
Sealed before handling, safe and reliable. Safety valve stem thimble will move forward the air valve in the valve stem valve connected to the pipeline.
Package Included: 1 Pc* R410A Valve; 1 Pc* R22 Valve.
Diameter: Male: About 1/4" (About 12 mm); Female: About 1/4" (About 12 mm).



Product show






More product show








Company Information




How to order




Packaging & Shipping




FAQ


Q1. Are you a factory or trade company?
 We are a factory located in  Diankou Town Industrial Park, Zhuji City, Zhejiang Province China.   Welcome to visit our factory
 
Q2. What kind of production service do you provide?
Mold making, die casting, CNC machining, CNC drilling,CNC milled machine ,welding, stamping, plastic injection, assembly, and surface treatment.
 
Q3. How about your quality?
♦We have got ISO9001:2015 and IATF16949 certificates.
♦We will make the operation instruction once the sample is approved.  
♦We will 100% inspect the products before shipment.
♦Transactions can be through Alibaba's trade assurance.
 
Q4. How long should we take for a quotation?
 After receiving detailed information(your 2D/3D drawings or samples), we will quote you within 2 days.
 
Q5. What is your quotation element?
Drawings or Sample, Material, Finish, and Quantity.
 
 Q6. How about the lead time?
Mould: 3-5 weeks
Mass production: 3-4 weeks
 
Q7. What is your payment term?
    Mould: 50% prepaid, balance after sample approval.
Goods: 50% prepaid, balance T/T before shipment.


Back home




0.1889 s.