Mining Equipment Gold Recovery Separator Horizontal Centrifugal Gold Concentrator

Share on (1601048528275):


Price:$1,500.00 - $5,000.00

Quantity:


Product Overview

Description



Product Description




Introduction
Gold centrifugal concentrator is a machine that was patented in China. It is an efficient machine that is useful in the recovery of free gold in all ranges of particle size. It is most especially useful for recovering fine gold which gets lost during the operation of gravitational concentrators. It is not only used for placer gold mining, but it can also be used for the recovery of natural gold from rocks that are hard, for replacing amalgamation and recovering of gold from the tailings.




Centrifugal concentrator Advantages:
1. High recovery and high concentrating ratio.
2. Recovery performance is steady.
3. Has a centre discharge design that enables fast and secure concentrate removal.
4. Eco friendly ( needs no reagents or chemical additives).
5. Low electricity and low water requirements.
6. Low cost of production, low maintenance requirements with durable wear parts.
7. Has a compact design needing less space and can be easily merged into an existing mining processing. 8. Fast returns on investment, usually less than 6 months.






Technical data


Model
STLB20
STLB30
STLB60
STLB80
STLB100
Capacity(T/H)
0.25-0.30
2-3
10-15
35-40
40-60
Feeding Size(mm)
0-3
0-4
0-6
0-6
0-6
Feeding Concentration (%)
0-50%
0-50%
0-50%
0-50%
0-50%
Back Wash Water (T/H)
1.5-2
4-6
10-15
17-25
40-60
Output (kg/time)
2-3
10-20
30-40
60-70
70-80
Power(kw)
0.75
1.5
4
15
22
Revolution
800
600
460
400
360
Pressure Water (M Pa)
0.04
0.1
0.16
0.18
0.2
Outline (mm)
790x785x790
1180x1140x1250
1970x1670x1750
2300x1800x2200
2500x2000x2400
Weight(kg)
300
500
1300
1800
2800








Successful cases


Gold Centrifugal Concentrator 100tph full set Alluvial Gold Plant Project in Ghana
We designed flowchart based on customer's gold mine site details.
We supplied full set gold plant: vibrating feeder, trommel scrubber washing machine, gold centrifugal concentrator, sluice box and shaking table.
1.Capacity:100TPH
2.Site:Ghana
3.Time:2018
4.Mineral:Placer Gold




Gold Centrifugal Concentrator 100tph full set Alluvial Gold Plant Project in Ghana
We designed flowchart based on customer's gold mine site details.
We supplied full set gold plant: vibrating feeder, trommel scrubber washing machine, gold centrifugal concentrator, sluice box and shaking table.
1.Capacity:100TPH
2.Site:Ghana
3.Time:2018
4.Mineral:Placer Gold




Nigeria 50TPH Mobile Clay Alluvial Gold Wash Plant.
Our factory supplied the complete line equipment.




Gold Process Flowchart






Packaging&Dilvery


●Ways Of Packing
● Shiping by sea/air freight
1.Small parts packed in the wooden cases.
or any way the customer requires.
2.Big parts packed by plastic membrane.
3.The whole big machine is loaded in the container.




Company Introduction




Ganzhou Eastman Technology Co.ltd is the direct sub-company of JXSC mine machinery factory ,which was set up in 1985 which has three series machines. The crushing machine, sand making machine and mineral processing equipment. The types of stone crushers are cone crusher, jaw crusher, impact crusher, and mobile rock crushing. We supply cost-effective products and first-class service, solutions, support for customers. Our factory has an area of 10000 square meters, USD 1000 million fixed assets, and the engineer and technical personnel covering 15% of the total staff. To build a factory for the production and export of China's top mining machinery is our goal.




We have passed CE Certification, National Level AAA Measurement System and ISO9001,ISO14001,OHSAS18001 Three Standard In One Certification.






FAQ


Q1: Are you trading company or manufacturer?
A: We are factory, since 1984.

Q2: How long is your delivery time?
A: Generally it is 7-10 days if the goods are in stock. Or it is 15-30 days if the goods are not in stock, it is according to quantity.

Q3: What is your payment method?
A: 30% of total prices should be paid by T/T as down payment; 70% balance payment should be paid by T/T before delivery.

Q4: How long is the warranty of your equipments? Does your company supply the spare parts?
A: The warranty period of crusher equipments is one year. And we will supply the spare parts for you at lowest cost.

Q5: If I need the complete crushing plant can you help us to build it?
A: Yes, we can help you set up a complete crushing line and give you related professional advices as long as you need. We had already build many mining projects in China & Overseas.




4.6248 s.