Api 16C Oilfield Wellhead Kill Manifold Choke Manifold

Share on (1601059011682):


Price:$10,000.00

Quantity:


Product Overview

Description





PRODUCTS DESCRIPTION


item
value
Usage
Oil Well
Warranty
1 year
After-sales Service Provided
Overseas third-party support available
Place of Origin
Shandong, China (Mainland)
Machine type
Drilling Equipment
Type
Choke manifold
Working Temperature
-29~121°C
Processing Type
Forging
Material
Carbon Steel


1.Configuration
The choke manifold consists of choke valves, gate valves, line pipes, fittings, pressure gauges and other components.

2.Application
Choke manifold is necessary device to control the well kick successfully and execute the pressure control technology on
oil/gas well in the course of drilling, as it is, the device is adopted to execute new drilling-well’s technique of balance pressure, which can avoid pollution of oil-layer, improve the speed of drilling and control blowout effectively. One end of the device connects with the side flange of BOP spool. When BOP closes, it can control the finite pressure from casing by adjusting the choke valve’s opening, so balanced drilling can work under minimum pressure-difference.

3.Working Principles
When the pressure inside the well rises, opening/closing the choke valves (including manual chokes, hydraulic chokes,
and positive chokes) on the choke manifold can allow the release of the fluid inside the well so as to control casing
pressure, which can be directly blown out through the gate valve if the casing pressure is quite high.

4.Pressure Ratings
The kill manifold is available in pressure ratings of 14MPa, 21MPa, 35MPa, 70MPa and 105MPa, and also can be available upon customer request.

5. Operating Instructions
(1) The working pressure of all components on the choke manifold shall be compatible with that of the BOP stack used.

(2) The choke manifold shall be installed at the place where the operator can reach it easily. The pressure test must be

performed prior to installation and the seat test pressure shall be equal to the rated working pressure.

(3) The line pipe shall be level and straight as much as it could. In case of the turn of the line pipe, the 120 degree steel

bent pipe shall be used. The bore of the line pipe shall be large enough.

(4) The pressure gauge must be installed.

(5) In winter, the choke manifold can work under a low temperature condition


PRODUCT DISPLAY






COMPANY PROFILE




EXHIBITION PICTURES




PRODUCTION INSPECTION PROCESS




PACKAGING AND DELIVERY




FAQ


The information you may like to know before order:

1. Methods of Payment:
T/T (Telegraphic Transfer) sor Western Union or L/C at sight

2. Handling time for an order
Based on order quantity, normally it takes 25 days for production.
Only 2 or 3 days if we have stock on your request size.

3. Shipping way
Sample order: we suggest Courier express like DHL/UPS/TNT/FEDEX or by air
Bulk order: we suggest by air or by sea.

4. Quality Control
We have our own experienced QC.
There will be strict inspection and testing for every order before shipping out.

5. After Services:
*Our sales team will response for your question within 24 hours (Holidays Excluded)
*Technical Support will be available in any time
*Free replacement will provide once the failure confirmed caused by our product quality





0.0281 s.