Forklift GM Engine 3 Ton CPQYD30 Diesel Lpg Gasoline Forklifts For Sale Electric Front Loader

Share on (1601074940502):


Price:$9,500.00 - $11,500.00

Quantity:


Product Overview

Description



Product Description


Application:
The electric wheel loader is suitable for the road construction, city construction, environmental health, coal and sand field, small and middle civil engineer, station, port, goods yard and warehouse etc. It is mainly used for the loading or transferring loose soil, sand, coal, slag, garbage etc.It can also be used to mound, dig, platen, collection, lift, traction etc.






Specification


Item
Parameter
Overall dimension (L*W*H)
3500*1200*2270mm with bucket
Overall dimension (L*W*H)
2450*1200*2270mm without bucket
Wheel base
835mm
Tread base
1310mm
Max. dumping height
1930mm
Max. dump distance
850mm
Max. discharging angle
40。
Max. turning angle
40。
Seat height
1200mm
Min. ground clearance
1600mm
Min turning radius
2300mm
Time in total
8S
Battery&capacity
300AH 48V
Moving motor
8Kw
Lifting motor
6.5Kw
Tire
23*8.5-12
Working time
8~9 hours
Whole weight
1930Kg
Rated load
600Kg


Wheel loader implements




Recommend Products




Company Profile






Product packaging






FAQ


Q: Can you tell us the price level?
A: We offer wholesale price directly even if you buy one piece, so our price will be 5% to 10% lower than other suppliers with the same quality.

Q: How about the quality?
A: All our products are tested before shipping, and offer quality report,all are Guaranteed

Q:Do you accept to customize the products as the customer’s requirement?
A:Yes, we accept to customize. Such as color, size, logo,capacity, etc.

Q.How can I pay you?
A: After you confirm the order, we will send you the PI, you can pay to our company account directly; Or you make the payment by Alibaba according to the Alibaba trade assurance Contract.All are safe, Alibaba will protect your money until you receive the goods when you choose the payment by Alibaba.

Q: How many days it takes before you deliver the products to us?
A:Generally, 20 days are ready.

Q: How should get the spare parts when we need in future?
A: We offer you directly at any time.




0.1826 s.